Sub-Farm D1E10 (vlan 910)
Sub-nets:
- 10.130.154.254 / 24
- 10.131.154.254 / 24
Ports:
Ports used:
Port |
host(s) |
Comment |
Gi 1/4 |
sw-d1e10-c1 |
farm uplink |
Switches
Computers
Name |
Serial |
base MAC |
Data patched to |
SW-DAQ-01 port |
hlte1002 |
SVXXD2J |
00:13:72:fa:ff:7a |
D2B1C04 |
Gi 0/54 |
hlte10 |
35Q222J |
00:14:22:B0:C7:D7 |
|
|
hlte1003 |
7VXXD2J |
00:13:72:fa:ff:84 |
D2B1C05 |
Gi 0/55 |
hlte1004 |
9VXXD2J |
00:13:72:fb:0d:6c |
D2B1C05 |
Gi 0/55 |
hlte1001 |
|
00:15:c5:e5:3a:a2 |
D2B1C04 |
Gi 0/54 |
Steps
Install & Cable Control & Data switches |
X |
Enter info in hlt_nodes.csv |
X |
Connect the uplink in D2 to the main control switch |
X |
Configure the swiches addresses in DNS & DHCP |
X |
Configure SW-UX-01 |
X |
Power on the switches |
X |
Configure the control switch |
X |
Update the Data switch firmware |
X |
Configure the Data switch |
X |
Install the Server |
X |
Connect data cables in D2 & configure SW-DAQ-01 |
X |
Connect the storage uplink |
X |
Install and boot the nodes |
X |
Test the connectivity |
X |
Ask for PVSS license |
X |
Install the pvss_licence on the node and in /var/www/html/pvss/licences on sw-sx-01. |
X |
This topic: LHCb
> WebHome >
LHCbOnline >
NetworkManagement >
PortsUX01 > FarmE10
Topic revision: r4 - 2008-04-08 - LoicBrarda