Task list

Task Assigned Next milestones Management responsible
Memory leak check Roel   Roel
First timing numbers versus SPD Roel To close the discussion on SPD cuts. First numbers expected mid Jan Roel
Track fitting Krakow Cost/performance tradeoff versus #fit iterations. Update expected mid Jan Mika
Hlt1/2 staged reco Sascha/Tim, Sebastian Cost (event size) of Hlt1 track persistance? Update expected mid Jan Vava
PV reconstruction Krakow VELO Kalman fit options. Update expected mid Jan Vava
Hlt2 RICH reco Olli, Roel Update expected mid Jan Roel
Timing of complete sequence Roel Choose a small set of tuning knobs and prepare timing/perf for presentation to the management. Aim to deliver this for the LHCb week. Need to start digesting first numbers early Feb Roel
Calo reconstruction Albert Goals still unclear -- To be discussed with Albert Roel
Ghost prob implementation ??? Discuss with offline tracking group Mika
HLT1 combinatorics Kenzie, Roel, Vanya Expect update by end of Jan, with idea to present LTUB line rates/effs at LHCb week Vava
Continued development of TESLA Sean, Tim, others Discuss with Patrick for EMTF, set deadline for a version which we can use to dry-run the measurements using generated minbias MC Roel
RICH mirror alignment Bristol Update and implementation in HLT code needed by end of Jan Roel
Monitoring Yandex+? (with support from Diego) Goals for start up to be defined Vava
HLT1 1-track versus 2-track MIT Studies resuming -- updates by end of Jan Mike
HLT2 TOPO tuning for 2015 MIT Studies resuming -- updates by end of Jan Mike
Exclusive charm Mike (S), Patrick First draft and implementation in HLT code with rates/effs by early Feb Vava
Inclusive D* Padova First draft and implementation in HLT code with rates/effs by early Feb Vava
Lifetime unbiased Kenzie First draft and implementation in HLT code with rates/effs by early Feb Vava
Inclusive muons Francesco First draft and implementation in HLT code with rates/effs by early Feb Mika
Electron lines Alex Shires First draft and implementation in HLT code with rates/effs by early Feb Mika
L0Muon FOI tuning Marco Fiore HLT ops presentation 30th Jan Mika
Tracking efficiencies Michael, Mika First draft and implementation in HLT code with rates/effs by early Feb Mika
Overall output rate strategy Vava, Mika Present to the management the physics impact of different rates splits between e.g. Topo:Charm:Rest by LHCb week?  
HLT2 cleanup campaign Vava, Roel, Mika Roel to define a set of rules for HLT2 line implementation by end of Jan  
Continued monitoring of special HLT line development Vava, Roel, Mika    
Lumi lines Vava, Roel    

Left over from the LS1 list

No delay initialisation Gerhard?  
Algo level parallisation many  

Track fit configuration

-- MikaVesterinen - 2015-01-07

Edit | Attach | Watch | Print version | History: r9 < r8 < r7 < r6 < r5 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r8 - 2015-05-20 - MikaVesterinen
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback