Shutdown activities
Sub detectors
Timetable
<<
May
>>
Mo
23
Tu
24
We
25
Th
26
Fr
27
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
29 Jan 2010 - 29 Jan 2010 -
08:00-23:00
Pump down of beam pipe
01 Feb 2010 - 01 Feb 2010 -
06:00-15:00
No access - maintenance CV - no ventilation.
02 Feb 2010 - 02 Feb 2010 -
06:00-17:00
Limited access into the cavern! Alarm transmission test.
19 Jan 2010 - 22 Jan 2010 -
09:00-21:00
VELO: exchange of filters in cooling system
20 Jan 2010 - 25 Jan 2010 -
08:00-19:00
RICH 2: Exchange of HPDs
20 Jan 2010 - 22 Jan 2010 -
08:00-18:00
Muon: Exchange chamber on M2 side C front
21 Jan 2010 - 21 Jan 2010 -
14:00-18:00
Survey: Muon station
25 Jan 2010 - 25 Jan 2010 -
14:00-18:00
Survey: RICH 2
26 Jan 2010 - 26 Jan 2010 -
14:00-18:00
Survey: RICH 2
LHCb Shutdown activities
Sub detector
Task
Responsible
start_DATE
end_DATE
Access Request
Work statement
COMMENTS
STATUS
AR terminated
Templates
2010-01-26
Template
TEMPLATE
Slighlty modified in 2010
in preparation
Beam Pipe
Venting
G. Schneider
2010-01-04
2010-01-07
UX85B-S-2010-001
n/a
No access to
UX85B
on 6.01.2010 from 11:00-15:00
done
Infrastructure
Intervention sur 3 Turbines Muon
L. Roy
2010-01-06
2010-02-12
UX85B-S-2010-002
IX0001-2010
done
Report UX85B-S-2010-002
Tracker Turicensis
Work on service boxes
J.v Tilburg
2010-01-11
2010-01-12
UX85B-S-2010-003
n/a
done
Infrastructure
Installation of RICH 1 crane control
B. Corajod
2010-01-07
2010-01-08
UX85B-S-2010-004
IX0002-2010
done
Report UX85B-S-2010-004
Infrastructure
Installation of distance pieces between RICH 1 rail and magnet
C. Fournier, G. Decreuse
2010-01-08
2010-01-08
UX85B-S-2010-004
IX0003-2010
done
Report UX85B-S-2010-004
Infrastructure
Replace Teflon washer for RICH 1 crane
C. Fournier, G. Decreuse
2010-01-08
2010-01-08
UX85B-S-2010-004
IX0004-2010
done
Report UX85B-S-2010-004
RICH 2
Look for Gas Leak
C. Frei, O. Ullaland
2010-01-11
2010-01-18
UX85B-S-2010-005
RD0001-2010
done
VELO
VELO cooling intervention
E. Jans
2010-01-19
2010-01-22
UX85B-S-2010-006
TV0001-2010
done
Inner Tracker
Daily cooling check
F. Blanc
2010-01-12
2010-01-29
UX85B-S-2010-007
n/a
done
Report UX85B-S-2010-007
Inner Tracker
Fix read-out
F. Blanc
2010-01-12
2010-01-29
UX85B-S-2010-008
n/a
done
Report UX85B-S-2010-008
RICH 2
Optical fiber power measurement
K. Wyllie
2010-01-12
2010-01-12
UX85B-S-2010-009
n/a
done
Outer Tracker
Open OT3 for FE exchange
A. Pellegrino
2010-01-13
2010-01-14
UX85B-S-2010-010
OT0001-2010
done
Report UX85B-S-2010-010
Outer Tracker
Work on OT1-OT3
A. Pellegrino
2010-01-15
2010-01-29
UX85B-S-2010-011
OT0001-2010
done
Report UX85B-S-2010-011
Infrastructure
General work
R. Lindner
2010-01-12
2010-02-12
UX85B-S-2010-012
n/a
done
Report UX85B-S-2010-012
RICH 2
HPD replacment
D. Piedigrossi
2010-01-20
2010-01-25
UX85B-S-2010-014
RD0002-2010
done
Muon
Change of a MWPC
B. Schmidt
2010-01-20
2010-01-22
UX85B-S-2010-015
UX0001-2010
done
Outreach
3d movies, Films + interviews
Bolek PIETRZYK
2010-01-21
2010-02-01
UX85B-S-2010-016
OutreachWork
done
ECAL
TVB replacment
M.N Minard
2010-01-26
2010-01-26
UX85B-S-2010-017
done
LHCbAccessReport_CALO-TVB_100126.doc
Beam Pipe
Pumping down of Beam Pipe
G. Schneider
2010-01-29
2010-01-29
UX85B-S-2010-001
No acces to the cavern between 10:00 and 14:00,critical phase
done
Outer Tracker
Irradiation tests
A.Pellegrino
2010-01-27
2010-01-29
UX85B-S-2010-018
Procedures EDMS no 942795
done
Report UX85B-S-2010-018
Calorimeter
Repair SPECS Mezzanine of CALORIMETER HV System
P. Perret
2010-02-02
2010-02-02
UX85B-S-2010-019
done
Report UX85B-S-2010-019
Calorimeter
Replacement of calorimeter front-end boards
Frédéric Machefert
2010-02-02
2010-02-03
UX85B-S-2010-020
done
Safety
Fire Brigade Visit of Underground Facilities
Eric Thomas
2010-01-28
2010-01-28
UX85B-S-2010-021
done
LHCbAccessReport-S-2010-021.docx
Safety
Fire Brigade Visit of Underground Facilities
Eric Thomas
2010-02-10
2010-02-10
UX85B-S-2010-022
done
LHCbAccessReport-S-2010-022.docx
RICH 2
Gas Enclosure Tightness: improvements and checks
Christophe Frei
2010-02-01
2010-02-08
UX85B-S-2010-023
RD-0003-2010
done
Outer Tracker
Re-commission OT
Antonio Pellegrino
2010-02-02
2010-02-12
UX85B-S-2010-024
RD-0004-2010
done
Report UX85B-S-2010-024
Outer Tracker
Work on OT gas system
Sebastian Bachmann
2010-02-02
2010-02-05
UX85B-S-2010-025
done
Report UX85B-S-2010-025
VELO
Repair on VELO C-side cooling system
Eddy Jans
2010-02-04
2010-02-05
UX85B-S-2010-026
done
Report UX85B-S-2010-026
HCAL
Source calibration of HCAL
Yury Guz
2010-02-05
2010-02-05
UX85B-S-2010-027
Procedures EDMS no 917876
done
Inner Tracker
Daily access to check cooling system + measure height of IT stations
Fred Blanc
2010-02-02
2010-02-12
UX85B-S-2010-028
done
Report UX85B-S-2010-028
Calorimeter
Control of cable connections
Frédéric Machefert
2010-02-04
2010-02-04
UX85B-S-2010-029
done
Calorimeter
Test of the trigger cabling ECAL / Preshower board
Regis Lefevre
2010-02-04
2010-02-04
UX85B-S-2010-030
done
LHCbAccessReport_CALO-FEBPS_100224.doc
Outer Tracker
Installation of OT protection
Antonio Pellegrino
2010-02-08
2010-02-12
UX85B-S-2010-031
RD-0005-2010
done
Report UX85B-S-2010-031
Infrastructure
Checks of RP measurement devices in presence of magnetic field
Gloria Corti
2010-02-08
2010-02-08
UX85B-S-2010-032
RD-0006-2010
done
Report UX85B-S-2010-032
ECAL
Replacement of a front-end board
Frédéric Machefert
2010-02-08
2010-02-08
UX85B-S-2010-033
done
RICH 2
RICH 1/2 Gas system restart
Christophe Frei
2010-02-08
2010-02-12
UX85B-S-2010-034
RD-0007-2010
done
Infrastructure
OT access side A
C. Fournier
2010-02-09
2010-02-09
UX85B-S-2010-004
IX0005-2010
done
Report UX85B-S-2010-004
Infrastructure
RICH 2 tower modification
C. Fournier
2010-02-01
2010-02-11
UX85B-S-2010-004
RD0008-2010
done
Report UX85B-S-2010-004
ECAL
Specs problem fixation
A. Konoplyannikov
2010-02-09
2010-02-09
UX85B-S-2010-035
RD-0009-2010
done
SPD
Check SPD regulators board
D. Esperante
2010-02-12
2010-02-12
UX85B-S-2010-036
done
LHCbAccessReport_SPD12Feb2010_1.doc
VELO
Fix loose cable
K. Hennessy
2010-02-12
2010-02-12
UX85B-S-2010-037
done
SPD
Replace problematic regulators board
P. Perret / D. Esperante
2010-02-15
2010-02-17
UX85B-S-2010-038
done
Report UX85B-S-2010-038
Infrastructure
General work
R. Lindner
2010-02-15
2010-02-18
UX85B-S-2010-039
done
Report UX85B-S-2010-039
Calorimeter
FEE change on HCAL
P. Perret
2010-02-19
2010-02-19
UX85B-S-2010-040
done
LHCbAccessReport_HCALFeb_16022010b.doc
Infrastructure
Area cleaning
G. Corti
2010-02-18
2010-02-18
UX85B-S-2010-041
done
Calorimeter
FEE change on HCAL
F. Machefert
2010-02-22
2010-02-22
UX85B-S-2010-042
done
Calorimeter
TVB replacement
P. Perret
2010-02-23
2010-02-23
UX85B-S-2010-043
done
LHCbAccessReport230210.doc
--
RolfLindner
- 05-Jan-2010
Attachments
Attachments
Topic attachments
I
Attachment
History
Action
Size
Date
Who
Comment
docx
LHCbAccessReport-S-2010-002.docx
r1
manage
15.4 K
2010-03-02 - 13:46
LaurentROY
docx
LHCbAccessReport-S-2010-021.docx
r1
manage
15.0 K
2010-03-02 - 11:29
EricThomas
docx
LHCbAccessReport-S-2010-022.docx
r1
manage
14.8 K
2010-03-02 - 11:30
EricThomas
doc
LHCbAccessReport230210.doc
r1
manage
35.0 K
2010-03-03 - 17:42
PerretPascal
doc
LHCbAccessReport_CALO-FEBPS_100224.doc
r1
manage
34.5 K
2010-03-03 - 17:46
PerretPascal
doc
LHCbAccessReport_CALO-TVB_100126.doc
r1
manage
35.0 K
2010-03-03 - 16:27
PerretPascal
doc
LHCbAccessReport_HCALFeb_16022010b.doc
r1
manage
106.0 K
2010-03-03 - 17:13
PerretPascal
doc
LHCbAccessReport_SPD12Feb2010_1.doc
r1
manage
31.5 K
2010-03-03 - 17:42
PerretPascal
doc
LHCbAccessRequest2to12Feb2010.doc
r2
r1
manage
48.0 K
2010-02-02 - 17:39
DirkWiedner
doc
LHCbAccessRequest_DP100118.doc
r1
manage
47.5 K
2010-01-18 - 17:56
EricThomas
doc
Outreach-AccessRequest.doc
r1
manage
46.0 K
2010-01-21 - 15:41
EricThomas
doc
Outreach-stament-01.doc
r1
manage
110.0 K
2010-01-21 - 15:36
EricThomas
This topic: LHCb
>
WebHome
>
LHCbTechnicalCoordination
>
LHCbActivitiesShutdown2010
Topic revision: r92 - 2010-03-03 - PerretPascal
Copyright &© 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use
Discourse
or
Send feedback