Shutdown activities

This page refers to activity for the Jan-Feb 2010 shutdown.

For access requests and overview refer to this page on the online twiki

Sub detectors

Timetable
   <<May >>
Mo
22
Tu
23
We
24
Th
25
Fr
26
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
     
07:00
08:00
09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00

  • 29 Jan 2010 - 29 Jan 2010 - 08:00-23:00 Pump down of beam pipe
  • 01 Feb 2010 - 01 Feb 2010 - 06:00-15:00 No access - maintenance CV - no ventilation.
  • 02 Feb 2010 - 02 Feb 2010 - 06:00-17:00 Limited access into the cavern! Alarm transmission test.
  • 19 Jan 2010 - 22 Jan 2010 - 09:00-21:00 VELO: exchange of filters in cooling system
  • 20 Jan 2010 - 25 Jan 2010 - 08:00-19:00 RICH 2: Exchange of HPDs
  • 20 Jan 2010 - 22 Jan 2010 - 08:00-18:00 Muon: Exchange chamber on M2 side C front
  • 21 Jan 2010 - 21 Jan 2010 - 14:00-18:00 Survey: Muon station
  • 25 Jan 2010 - 25 Jan 2010 - 14:00-18:00 Survey: RICH 2
  • 26 Jan 2010 - 26 Jan 2010 - 14:00-18:00 Survey: RICH 2

LHCb Shutdown activities

Sub detector Task Responsible start_DATE end_DATE Access Request Work statement COMMENTS STATUS AR terminated
  Templates   2010-01-26   Template TEMPLATE Slighlty modified in 2010 roll eyes (sarcastic) in preparation  
Beam Pipe Venting G. Schneider 2010-01-04 2010-01-07 UX85B-S-2010-001 n/a No access to UX85B on 6.01.2010 from 11:00-15:00 big grin done  
Infrastructure Intervention sur 3 Turbines Muon L. Roy 2010-01-06 2010-02-12 UX85B-S-2010-002 IX0001-2010   big grin done Report UX85B-S-2010-002
Tracker Turicensis Work on service boxes J.v Tilburg 2010-01-11 2010-01-12 UX85B-S-2010-003 n/a   big grin done Report_UX85B-S-2010-003.doc
Infrastructure Installation of RICH 1 crane control B. Corajod 2010-01-07 2010-01-08 UX85B-S-2010-004 IX0002-2010   big grin done Report UX85B-S-2010-004
Infrastructure Installation of distance pieces between RICH 1 rail and magnet C. Fournier, G. Decreuse 2010-01-08 2010-01-08 UX85B-S-2010-004 IX0003-2010   big grin done Report UX85B-S-2010-004
Infrastructure Replace Teflon washer for RICH 1 crane C. Fournier, G. Decreuse 2010-01-08 2010-01-08 UX85B-S-2010-004 IX0004-2010   big grin done Report UX85B-S-2010-004
RICH 2 Look for Gas Leak C. Frei, O. Ullaland 2010-01-11 2010-01-18 UX85B-S-2010-005 RD0001-2010   big grin done  
VELO VELO cooling intervention E. Jans 2010-01-19 2010-01-22 UX85B-S-2010-006 TV0001-2010   big grin done  
Inner Tracker Daily cooling check F. Blanc 2010-01-12 2010-01-29 UX85B-S-2010-007 n/a   big grin done Report UX85B-S-2010-007
Inner Tracker Fix read-out F. Blanc 2010-01-12 2010-01-29 UX85B-S-2010-008 n/a   big grin done Report UX85B-S-2010-008
RICH 2 Optical fiber power measurement K. Wyllie 2010-01-12 2010-01-12 UX85B-S-2010-009 n/a   big grin done  
Outer Tracker Open OT3 for FE exchange A. Pellegrino 2010-01-13 2010-01-14 UX85B-S-2010-010 OT0001-2010   big grin done Report UX85B-S-2010-010
Outer Tracker Work on OT1-OT3 A. Pellegrino 2010-01-15 2010-01-29 UX85B-S-2010-011 OT0001-2010   big grin done Report UX85B-S-2010-011
Infrastructure General work R. Lindner 2010-01-12 2010-02-12 UX85B-S-2010-012 n/a   big grin done Report UX85B-S-2010-012
RICH 2 HPD replacment D. Piedigrossi 2010-01-20 2010-01-25 UX85B-S-2010-014 RD0002-2010   big grin done  
Muon Change of a MWPC B. Schmidt 2010-01-20 2010-01-22 UX85B-S-2010-015 UX0001-2010   big grin done Report UX85-S-2010-015
Outreach 3d movies, Films + interviews Bolek PIETRZYK 2010-01-21 2010-02-01 UX85B-S-2010-016 OutreachWork   big grin done  
ECAL TVB replacment M.N Minard 2010-01-26 2010-01-26 UX85B-S-2010-017     big grin done LHCbAccessReport_CALO-TVB_100126.doc
Beam Pipe Pumping down of Beam Pipe G. Schneider 2010-01-29 2010-01-29 UX85B-S-2010-001   No acces to the cavern between 10:00 and 14:00,critical phase big grin done  
Outer Tracker Irradiation tests A.Pellegrino 2010-01-27 2010-01-29 UX85B-S-2010-018   Procedures EDMS no 942795 big grin done Report UX85B-S-2010-018
Calorimeter Repair SPECS Mezzanine of CALORIMETER HV System P. Perret 2010-02-02 2010-02-02 UX85B-S-2010-019     big grin done Report UX85B-S-2010-019
Calorimeter Replacement of calorimeter front-end boards Frédéric Machefert 2010-02-02 2010-02-03 UX85B-S-2010-020     big grin done LHCbAccessReport_CALOMachefert-020.doc
Safety Fire Brigade Visit of Underground Facilities Eric Thomas 2010-01-28 2010-01-28 UX85B-S-2010-021     big grin done LHCbAccessReport-S-2010-021.docx
Safety Fire Brigade Visit of Underground Facilities Eric Thomas 2010-02-10 2010-02-10 UX85B-S-2010-022     big grin done LHCbAccessReport-S-2010-022.docx
RICH 2 Gas Enclosure Tightness: improvements and checks Christophe Frei 2010-02-01 2010-02-08 UX85B-S-2010-023 RD-0003-2010   big grin done  
Outer Tracker Re-commission OT Antonio Pellegrino 2010-02-02 2010-02-12 UX85B-S-2010-024 RD-0004-2010   big grin done Report UX85B-S-2010-024
Outer Tracker Work on OT gas system Sebastian Bachmann 2010-02-02 2010-02-05 UX85B-S-2010-025     big grin done Report UX85B-S-2010-025
VELO Repair on VELO C-side cooling system Eddy Jans 2010-02-04 2010-02-05 UX85B-S-2010-026     big grin done Report UX85B-S-2010-026
HCAL Source calibration of HCAL Yury Guz 2010-02-05 2010-02-05 UX85B-S-2010-027   Procedures EDMS no 917876 big grin done LHCbAccessReport_050210.doc
Inner Tracker Daily access to check cooling system + measure height of IT stations Fred Blanc 2010-02-02 2010-02-12 UX85B-S-2010-028     big grin done Report UX85B-S-2010-028
Calorimeter Control of cable connections Frédéric Machefert 2010-02-04 2010-02-04 UX85B-S-2010-029     big grin done LHCbAccessReport_CALOMachefert-029.doc
Calorimeter Test of the trigger cabling ECAL / Preshower board Regis Lefevre 2010-02-04 2010-02-04 UX85B-S-2010-030     big grin done LHCbAccessReport_CALO-FEBPS_100224.doc
Outer Tracker Installation of OT protection Antonio Pellegrino 2010-02-08 2010-02-12 UX85B-S-2010-031 RD-0005-2010   big grin done Report UX85B-S-2010-031
Infrastructure Checks of RP measurement devices in presence of magnetic field Gloria Corti 2010-02-08 2010-02-08 UX85B-S-2010-032 RD-0006-2010   big grin done Report UX85B-S-2010-032
ECAL Replacement of a front-end board Frédéric Machefert 2010-02-08 2010-02-08 UX85B-S-2010-033     big grin done LHCbAccessReport_CALOMachefert-033.doc
RICH 2 RICH 1/2 Gas system restart Christophe Frei 2010-02-08 2010-02-12 UX85B-S-2010-034 RD-0007-2010   big grin done  
Infrastructure OT access side A C. Fournier 2010-02-09 2010-02-09 UX85B-S-2010-004 IX0005-2010   big grin done Report UX85B-S-2010-004
Infrastructure RICH 2 tower modification C. Fournier 2010-02-01 2010-02-11 UX85B-S-2010-004 RD0008-2010   big grin done Report UX85B-S-2010-004
ECAL Specs problem fixation A. Konoplyannikov 2010-02-09 2010-02-09 UX85B-S-2010-035 RD-0009-2010   big grin done LHCbAccessReport100209.doc
SPD Check SPD regulators board D. Esperante 2010-02-12 2010-02-12 UX85B-S-2010-036     big grin done LHCbAccessReport_SPD12Feb2010_1.doc
VELO Fix loose cable K. Hennessy 2010-02-12 2010-02-12 UX85B-S-2010-037     big grin done  
SPD Replace problematic regulators board P. Perret / D. Esperante 2010-02-15 2010-02-17 UX85B-S-2010-038     big grin done Report UX85B-S-2010-038
Infrastructure General work R. Lindner 2010-02-15 2010-02-18 UX85B-S-2010-039     big grin done Report UX85B-S-2010-039
Calorimeter FEE change on HCAL P. Perret 2010-02-19 2010-02-19 UX85B-S-2010-040     big grin done LHCbAccessReport_HCALFeb_16022010b.doc
Infrastructure Area cleaning G. Corti 2010-02-18 2010-02-18 UX85B-S-2010-041     big grin done Report UX85B-2010-S-041
Calorimeter FEE change on HCAL F. Machefert 2010-02-22 2010-02-22 UX85B-S-2010-042     big grin done LHCbAccessReport_CALOMachefert-042.doc
Calorimeter TVB replacement P. Perret 2010-02-23 2010-02-23 UX85B-S-2010-043     big grin done LHCbAccessReport230210.doc

-- RolfLindner - 05-Jan-2010

Topic attachments
I Attachment History Action Size Date Who Comment
Unknown file formatdocx LHCbAccessReport-S-2010-002.docx r1 manage 15.4 K 2010-03-02 - 13:46 LaurentROY  
Unknown file formatdocx LHCbAccessReport-S-2010-021.docx r1 manage 15.0 K 2010-03-02 - 11:29 EricThomas  
Unknown file formatdocx LHCbAccessReport-S-2010-022.docx r1 manage 14.8 K 2010-03-02 - 11:30 EricThomas  
Microsoft Word filedoc LHCbAccessReport100209.doc r1 manage 35.0 K 2010-03-08 - 20:16 PerretPascal  
Microsoft Word filedoc LHCbAccessReport230210.doc r1 manage 35.0 K 2010-03-03 - 17:42 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_050210.doc r1 manage 35.0 K 2010-03-03 - 19:37 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_CALO-FEBPS_100224.doc r1 manage 34.5 K 2010-03-03 - 17:46 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_CALO-TVB_100126.doc r1 manage 35.0 K 2010-03-03 - 16:27 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_CALOMachefert-020.doc r1 manage 15.0 K 2010-03-08 - 18:45 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_CALOMachefert-029.doc r1 manage 14.5 K 2010-03-08 - 18:46 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_CALOMachefert-033.doc r1 manage 14.5 K 2010-03-08 - 18:46 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_CALOMachefert-042.doc r1 manage 14.5 K 2010-03-08 - 18:46 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_HCALFeb_16022010b.doc r1 manage 106.0 K 2010-03-03 - 17:13 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_SPD12Feb2010_1.doc r1 manage 31.5 K 2010-03-03 - 17:42 PerretPascal  
Microsoft Word filedoc LHCbAccessReport_UX001-22012010.doc r1 manage 31.5 K 2010-03-10 - 08:52 BurkhardSchmidt  
Microsoft Word filedoc LHCbAccessRequest2to12Feb2010.doc r2 r1 manage 48.0 K 2010-02-02 - 17:39 DirkWiedner  
Microsoft Word filedoc LHCbAccessRequest_DP100118.doc r1 manage 47.5 K 2010-01-18 - 17:56 EricThomas  
Microsoft Word filedoc Outreach-AccessRequest.doc r1 manage 46.0 K 2010-01-21 - 15:41 EricThomas  
Microsoft Word filedoc Outreach-stament-01.doc r1 manage 110.0 K 2010-01-21 - 15:36 EricThomas  
Microsoft Word filedoc Report_UX85B-S-2010-003.doc r1 manage 35.5 K 2010-05-14 - 10:05 JeroenVanTilburg  
Edit | Attach | Watch | Print version | History: r99 < r98 < r97 < r96 < r95 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r99 - 2010-09-02 - GloriaCorti
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback