Optical fibres for ComLab

These sketches show the proposed fibre connections for the full-column commissioning set-up. To zoom in with your browser it is best to right-click and select View image before using your browser zoom capability because the TWiki resizing is not very helpful.

RICH2-CommLab-ECS-fibres

RICH2-CommLab-Data-fibres

The sketches are for RICH2. For RICH1, replace each PDM-H with a PDM-R. Two columns breakouts are sufficient for RICH1 or RICH2 TFC/ECS. RICH1 requires 6 column breakouts for data and RICH2 requires 4. Therefore the fixed CommLab fibre installation should allow 6 MPO12 paths to the TEL40. -- GiovanniCavallero - 2019-08-13

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2019-08-13 - GiovanniCavallero
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback