Precision Timing ECAL for Upgrade-II
Talks
- Upgrade Ib/II calorimeter meeting.[ Feb 23rd, 2018
] (By A.Davis)
- Upgrade Ib/II calorimeter meeting.[ Oct 8th, 2018
] (By A.Davis)
- Upgrade Ib/II calorimeter meeting.[ Nov 23rd, 2018] (By Z.Xu)
- Upgrade Ib/II calorimeter meeting.[ Feb 15th, 2019
] (By Z.Xu)
- UpgradeII meeting in Amsterdam.[ Apr 9th, 2019
] (By Z.Xu)
- LHCb weekly Simulation meeting. [ May 28th, 2019
] (By Z.Xu)
- CALO upgrade brainstorming meeting. [ June 4th, 2019
] (By Z.Xu)
- CALO occupancy and timing in 92nd LHCb Week. [ June 17t, 2019
] (By Z.Xu)
- Simulation for calo upgrade2. [ Octorber 15th, 2019
] (By Z.Shen)
- Simulation for calo upgrade2. [ March 10th, 2020
] (By Z.Xu)
- Simulation for calo upgrade2. [ May 14th, 2020
] (By Z.Xu)
- Simulation for calo upgrade2. [ June 4th, 2020
] (By Z.Yang)
- Simulation for calo upgrade2. [ June 25th, 2020] (By Z.Xu)
- Simulation for calo upgrade2. [ Octorber 13th, 2020
] (By Z.Xu)
- Simulation for calo upgrade2. [ November 4th, 2020
] (By Z.Wang)
- Simulation for calo upgrade2. [ November 26th, 2020
] (By Z.Yang)
Notes
Fast simulation
Full simulation of Si-W Ecal
Public Documents
- ongoing and overleaf link.
Code repository
PTECAL Parameterized simulation
PTECAL full simulation
- Generated level simulation tool
- GEANT4 simulation tool
- Reconstruction and identification tool
Full Simulation Framework

This topic: LHCb
> WebHome > PTECAL
Topic revision: r31 - 2020-12-02 - ZehuaXu