We are producing Phys06-S5, Phys06-S2 with the following priority:

A) Highest priority:

- all low-lumi samples labeled "1a"

- 50k of low-lumi events labeled "1b"

B) Second highest priority:

- all high-lumi samples labeled "1a"

- 50k of high-lumi events labeled "1b"

- all low-lumi and high-lumi samples labeled "2a"

- 50k of low-lumi and 50k of high-lumi events labeled "2b"

C) Third highest priority:

- finish production requests made during last LHCb week

- finish all samples labeled "1b" and "2b"

Instructions for production manager:

10 jobs of each production requested have been submitted in order to test all the eventtypes. After you should proceed by order of priority : 1a, 1b, 2a, 2b, 3. When we need more than 1Million events for a given type, I propose that we produce first 1M events and then continue with other event type and when al the "small" production are exhausted, we complete the "big" request.

Here you can find the OldProduction.

Edit | Attach | Watch | Print version | History: r85 < r84 < r83 < r82 < r81 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r85 - 2007-01-25 - JoelClosier
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback