21 March (Monday)

  • Activity
    • Validation of 2015 data reprocessing (ProtonArgon and Lead)
    • Validation of RUN1 incremental stripping
    • MC and User jobs

  • Site Issues
    • T1:
      • PIC: (GGUS:120317) Pilots Aborted due to closed queues.

14 March (Monday)

  • Site Issues
    • T1:
      • RAL: Two disk servers went down over the weekend but are now back up.

7 March (Monday)

  • Site Issues
    • T0: HTCondor-CE for job submission working. Pilot log retrieval not operational yet.

    • T1:
      • IN2P3: Pilots failing b/c exceeding memory limits (GGUS:119886). Problematic event type for the currently ongoing validation of the next version of the simulation framework.

-- JoelClosier - 2017-01-10


This topic: LHCb > WebHome > LHCbComputing > ProductionOperations > ProductionOperationsWLCGdailyReports > ProductionOperationsWLCG2016Reports > ProductionOperationsWLCGMar16Reports
Topic revision: r1 - 2017-01-10 - JoelClosier
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.