PID Performance Plots

This page contains official performance plots for the various reconstruction versions. All plots were generated using calibration samples generated and processed using code in the PIDCalib package.

Reco10 (Stripping13b)

Magnet Up Magnet Down
All Tracks Error: (3) can't find KPi_Separation_MagUp.png in LHCb Error: (3) can't find KPi_Separation_MagDown.png in LHCb
+ve Tracks   Error: (3) can't find KPi_Separation_MagDown_Pos.png in LHCb
-ve Tracks   Error: (3) can't find KPi_Separation_MagDown_Neg.png in LHCb

Reco09 (Stripping13)

Reco08 (Stripping12)

-- AndrewPowell - 21-Jun-2011

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2011-06-22 - AndrewPowell
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback