This page contains a checklist of deliverables needed before the green light can be given to a reprocessing. A copy of this checklist should be filled in for each new reprocessing.
Reprocessing checklist for Reco14/Stripping20 (for 2011 and 2012 data)
A. Releases
All needed software must be released and distributed on CVMFS
A.1 Reconstruction
- Check with sub-system software coordinators that all expected updates have been included
Subsystem |
Coordinator |
Software released (SVN tag) |
Brunel Framework |
Marco Cattaneo |
|
Velo |
David Hutchcroft |
Yes in Brunel v43r1p1 |
ST |
Mark Tobin |
|
OT |
Lucia Grillo, Francesco Dettori |
No changes planned |
Tracking Pattern Recognition |
Jeroen van Tilburg |
Yes, in Brunel v43r1p1 |
Track Fit |
Jeroen van Tilburg |
Yes, in Brunel v43r1p1 |
Primary Vertex |
Mariusz Witek |
Yes, in Brunel v43r1p1 |
Rich |
Chris Jones |
Yes, in Brunel v43r1p1 |
Calo |
Olivier Deschamps |
Yes, in Brunel v43r1p1 |
Muon ID |
Helder Lopes |
No changes planned |
Global PID |
Chris Jones |
|
Lumi |
Jaap Panman |
No changes needed |
A.2 Stripping
- Check that all expected updates included
Subsystem |
Coordinator |
Software released (SVN tag) |
Davinci Framework |
Chris Jones |
|
Stripping Framework |
Anton Poluetkov |
|
Stripping Lines |
Anton Poluetkov |
|
Stripping options in AppConfig |
Anton Poluetkov |
|
A.3 Conditions Database
- Check with sub-system software coordinators that all expected updates have been included for all IOVs
2012 calibrations for Reco14 |
Subsystem |
Coordinator |
Tag / Patch |
Last validated date |
Velo alignment |
Silvia Borghi |
patch 5506 |
expect no change until end of year, unless velo half misalignment seen by DQ |
ST dead channels |
Frederic Dupertuis |
patch 5575 |
Validated until run 133785 [6th December] |
ST charge and noise calibration |
Frederic Dupertuis |
no change |
Validated until run 133785 [6th December] |
OT time calibration |
Lucia Grillo |
patch 5544 |
expect no further change until end of year |
Tracking alignment |
Maurizio Martinelli |
patch 5581 |
Validated until run 133785 [6th December] |
Rich refractive index |
Chris Jones |
patch 5586 |
run 134455 (16th December) |
Rich mirror alignment |
Chris Jones |
patch 5586 |
run 134455 (16th December) |
Rich HPD occupancies |
Chris Jones |
patch 5586 |
run 134455 (16th December) |
Rich HPD image alignment |
Chris Jones |
patch 5586 |
run 134455 (16th December) |
Ecal(+Hcal) gain correction |
Olivier Deschamps |
patch 5583 |
Validated until run 133785 [6th December] |
Calo PID calibration |
Olivier Deschamps |
calo-20120720 |
expect no change until end of year |
Calo reconstruction |
Olivier Deschamps |
patch 5583 |
Validated until run 133785 [6th December] |
Calo alignment |
Olivier Deschamps |
no change wrt 2011 |
expect no change until end of year |
Muon ID calibration |
Helder Lopes |
no changes |
expect no change until end of year |
B. Software Validation
B.1 Reco
- Make production step
- Reconstruct one fill
- check DQ c.f. previous Reco
- check timing
- check memory use
B.2 Stripping
- Make production step
- Strip previously reconstructed fill
- check timing
- check memory use
B.3 Merging.
- Make production step
- Merge previously stripped fill
- Check FSRs present on all streams
- Check all expected lines present with expected retentions
C. Physics validation (green light for reprocessing)
Can be done within final production workflow, with a defined run range
- Process ~30pb-1 with validated software
- Get sign off from all physics groups (max one week)
Reprocessing checklist for Reco14/Stripping20r2 (2013 2.76 TeV pp data)
See
ReprocessingChecklist2013pp
Reprocessing checklist for Reco14 (2010 data)
See
ReprocessingChecklist2010
--
MarcoCattaneo - 16-Nov-2012