Rich Operations
With these pages we hope to provide helpful information on operating the RICH detectors during commissioning and data-taking. However, much of the information contained here is also relevant to the operation of the RICH components in the SSB labs and elsewhere.
Quick links have now been provided in the sidebar at the left for easier navigation.
Recent issues
- 12/3/2008. The most up to date data base is not yet in use. It requires that we update to Online_v4r6 but this is awaiting a fix to a 64-bit related issue. In progress. In the meantime some HPDs are not visible on the event display.
Yellow pages
IP8 Control room (RICH/Calo/Muon) |
77862 |
IP8 Control room (VeLo/ST/OT) |
77867 |
IP8 Control room |
77869 |
IP8 Control room |
77874 |
IP8 RICH Labo |
77870 |
IP8 Counting Room D3 |
77889 |
SSB1 lab. |
74071 |
RICH readout on call |
163837 |
DAQ on call |
160703 |
TFC (ODIN) |
163730 |
Paolo Guglielmini (Cooling) |
163343 |
Olav |
163342 |
Alessandro (mobile) |
+39 3484963256 |
Antonis (mobile) |
+41 762079538 |
RICH operations mailing list |
lhcb-rich-operations@cernNOSPAMPLEASE.ch |
DAQ support list |
lhcb-online-admins@cernNOSPAMPLEASE.ch |
Control room printer |
2885-R008-HP |
HPD
HPD operational info. (Anode bias, HV)
Attached to this page is an Excel spreadsheet containing the HPD IDs in various numbering schemes.
The assignment of HV channels to RICH2 columns is can be found
here.
Run Conditions eLogbook Template
RichRunConditionsTemplate