Setup

The setup for the 2018 testbeam is composed by a PDM-R and a PDM-H, being to the right and to the left of the beam line, respectively.

setup.JPG

Each PDM is composed by four Elementary Cells (EC0, EC1, EC2, EC3 from the top to the bottom).
Each PDMDB-R is composed by four MaPMTs, named by using the following convention:

PMT0 PMT2
PMT1 PMT3

PDM-R is readout by two digital boards: the PDMDB0 reads out PMT0 and PMT1, PDMDB1 reads out PMT2 and PMT3 of each EC.

PDMDB firmwares

Use Full_FIFO_Calib version 67bf85b for timing purposes (spillover veto), laser offset: 1066. Use Full_FIFO_Calib version 967bc69 for threshold scans, spillover studies and absolute zero runs, laser offset: 10ED.

Use -- GiovanniCavallero - 2018-10-09

Topic attachments
I Attachment History Action Size Date Who Comment
JPEGjpg setup.JPG r1 manage 2837.6 K 2018-10-09 - 12:04 GiovanniCavallero  
Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r4 - 2018-10-13 - GiovanniCavallero
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback