RICH Upgrade Project
This page contains information related to LHCb-RICH Upgrade
RICH Upgrade papers
RICH Upgrade Simulation
RICH Upgrade Hardware
RICH Upgrade Data Readout
RICH Upgrade ECS
RICH Upgrade Test-Beam
RICH Upgrade SysLab
RICH Upgrade ComLab
RICH Upgrade papers
RICH2019: A proposal for the LHCb-RICH upgrade
LHCb Upgrade - Particle Identification TDR (including RICH)
The Future of RICH Detectors through the Light of the LHCb RICH
RICH Upgrade Simulation
Simulations for the RICH upgrade
RICH Upgrade Hardware
The Elementary Cell of the photo-detector
The HV system
DCS: the GBT-SCA
DCS: the ELMB
DCS: the LV system
The DSS system
The gas system
The cooling system
Optical Fibers for the ComLab
Machines used in the SysLab and ComLab
RICH1 Upgrade Mechanical Engineerging
RICH2 Upgrade Mechanical Engineerging
RICH Upgrade Data Readout
Electronics
RICH Upgrade ECS
WinCC projects
Development guidelines
HV
DAQ
DCS
Setup of OPC-UA servers
Inventory-Bookkeeping-Connectivity DataBase (IBCDB)
RICH Upgrade Test-Beam
Test-Beam related stuff
RICH Upgrade
SysLab
Operating the setup in the SysLab
RICH Upgrade
ComLab
Operating the setup in the ComLab
This topic: LHCb
>
WebHome
>
LHCbRICH
>
RichUpgrade
Topic revision: r14 - 2019-09-04 - GiovanniCavallero
Copyright &© 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use
Discourse
or
Send feedback