RICH Upgrade Project

This page contains information related to LHCb-RICH Upgrade

  • RICH Upgrade papers
  • RICH Upgrade Simulation
  • RICH Upgrade Hardware
  • RICH Upgrade Data Readout
  • RICH Upgrade ECS
  • RICH Upgrade Test-Beam
  • RICH Upgrade SysLab
  • RICH Upgrade ComLab

RICH Upgrade papers

  • RICH2019: A proposal for the LHCb-RICH upgrade
  • LHCb Upgrade - Particle Identification TDR (including RICH)
  • The Future of RICH Detectors through the Light of the LHCb RICH

RICH Upgrade Simulation

  • Simulations for the RICH upgrade

RICH Upgrade Hardware

  • The Elementary Cell of the photo-detector
  • The HV system
  • DCS: the GBT-SCA
  • DCS: the ELMB
  • DCS: the LV system
  • The DSS system
  • The gas system
  • The cooling system
  • Optical Fibers for the ComLab
  • Machines used in the SysLab and ComLab
  • RICH1 Upgrade Mechanical Engineerging
  • RICH2 Upgrade Mechanical Engineerging

RICH Upgrade Data Readout

  • Electronics

RICH Upgrade ECS

  • WinCC projects

  • Development guidelines

  • HV

  • DAQ

  • DCS

  • Setup of OPC-UA servers

  • Inventory-Bookkeeping-Connectivity DataBase (IBCDB)

RICH Upgrade Test-Beam

  • Test-Beam related stuff

RICH Upgrade SysLab

  • Operating the setup in the SysLab

RICH Upgrade ComLab

  • Operating the setup in the ComLab


This topic: LHCb > WebHome > LHCbRICH > RichUpgrade
Topic revision: r14 - 2019-09-04 - GiovanniCavallero
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback