Task: Water Cooling

Scope

The tasks ensures the proper cooling of the readout electronics with water. This comprises the mounting of the cooling blocks and tubes (partly on the I-beams before C-frame assembly?), followed by a tightness test under pressure. For the test of up to 1 full C-frame at a time, the heat shall be evacuated by the mixed water available in B3852 or by a small lab chiller. Extra temperature probes may be needed as electronic cards are not yet mounted at this stage? To be discussed and decided.

-- ChristianJoram - 2018-01-16

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2018-11-27 - BlakeLeverington
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback