Task: High Voltage

Scope

The tasks consists in providing and testing the HV (SiPM bias) supply via the cables and patch panels to the FE cards of one full C-frame at a time. The required Slow control (based on WinCC) needs to be developed. The system has to be built up in B3852. Links to task "Cables / Com fibres".

-- ChristianJoram - 2017-11-21