Task: Low Voltage

Scope

The tasks consists in providing and testing the LV supply for FEE, from the Maraton power supply via the cables and patch panels to the FE cards of one full C-frame at a time. The required Slow control (based on WinCC) needs to be developed. WinCC support will be provided by CERN. The system has to be built up in B3852.

-- ChristianJoram - 2018-01-29

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2018-11-27 - BlakeLeverington
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback