Welcome to the LHCb Upgrade Silicon Tracker page
This twiki collects information about the LHCb upgrade silicon TT and upgrade silicon IT
UT (TT Upgrade)
The information in this section has been moved/reorganized below
TDR
SVN repository
Outline and editors (last update 2014.01.07)
Section |
Editors |
Num. pages |
UT |
|
57 |
Experience from TT |
Steinkamp |
3 |
Requirements |
Stone |
5 |
Geometry |
Wang |
3 |
Sensor |
Artuso,Steinkamp |
3 |
SALT ASIC |
Idzik, Szumlak |
6 |
Electronics |
Jawahery |
8 |
UT DAQ integration |
Saornil |
4 |
Mechanics |
Mountain |
8 |
Cooling |
Neri |
4 |
Integration and testing |
Blusk, Skwarnicki |
6 |
Project organization |
Artuso, Stone |
6 |
Documents for framework TDR
For reference and "inspiration":
R&D towards TDR
- Design concept and goals presented by M. Artuso Presentation at the LHCb Upgrade Tracking Workshop
- Study of ghost reduction optimization of TT Tracker by J. Wang study of ghost suppression with the TT
- Instructions on how to run with modified magnetic field and no RICH1 here
- Beam pipe interface design studies and tests: talk1
(Kaan Vatansever, LHCb Upgrade Silicon Tracker meeting, 5-dec-2012), EDMS report
.
- Mechanical requirements document for UT here (R. Mountain, et al., v2, rev.5/6/2013), updated here (v3, 10/7/2013).
- Numerology of UT detector (by J.C. Wang, et al.): ASICS, readout eLinks, power lines, etc. v5, 04/04/2014,v6, 01/12/2015.
Project management, cost and technical issues
Project Organization
Software for TT Upgrade
- This is a repository of useful information for code development to optimize the UT detector use in the tracking software.
- script_performanceStudy.tar.gz: Set of scripts for performance studies, and optimization studies
Requirements
Geometry
Sensor
SALT ASIC
Electronics
Useful documentation
Power Supply
A set of useful document is linked here, Daniel's thesis is essentially a very useful manual to the HV and LV of the TT
TFC and ECS
TFC commands
Our SOL40 boards will transmit 8 TFC information bits repeated 8 or 10 times in each SOL40 GBT frame:
- FE reset
- BXID reset
- BX Veto OR Header Only : Single signal as the ASIC needs to perform the same way for both.
- NZS
- Calibration
- Synch
- Snapshot
- Extra bit : We can have a second calibration bit, or the LSB of the BXID
For each GBT master 8 or 10 eLinks at 320Mbps will send the data to the FE. Each eLink contains all the necessary TFC information.
ECS
Most of the detector monitoring and configuration will be done using the SOL40 boards with GBT-SCA chips. The exceptions are:
- HV PS : OPC server
- LV PS : OPC server
- Cooling : TBD
- TELL40 : CCPC server
The main SCA interfaces are:
- SALT I2C
- Data GBTx I2C
- Temperature and humidity sensors ADC
- LV regulators ADC
- GPIO for LV regulators inhibit
- JTAG for FPGA (if present)
Monitoring
- SALT : Status registers (LDO, DLL, PLL, ADC, DSP, Buffer, SEU, etc.), TFC counters
- data GBTs status
- Hybrid temperature sensors
- Box humidity sensors
- Balcony electronics temperature
- Master GBTx status
- LV regulators output voltage
- HV PS current and voltage
- LV PS current and voltage
- Cooling temperature
- TELL40 status
Detector Safety System
PLC sensors will have to be deployed around the detector:
- Box temperature and humidity
- Balcony electronics temperature
- Cooling
- HV interlock
- Smoke detection
- Water leak detection
- Gas flow in the box
- If we plan to cool the Balcony electronics with air, we need to know if the air is flowing or not.
Failure or alarm in those sensors should trigger either an alarm to the expert on call and a power cut when there is immediate danger for the electronics. The smoke detection should also trigger an alarm to the fire brigade.
Mechanics
- Mechanical requirements document for UT here (R. Mountain, et al., v2, rev.5/6/2013), updated here (v3, 10/7/2013).
- Beam pipe interface design studies and tests: talk1
(Kaan Vatansever, LHCb Upgrade Silicon Tracker meeting, 5-dec-2012), EDMS report
.
Cooling
gathering the edms documents concerning the cooling plants...
Irradiation Plans
This section includes talks and material about irradiation plans of SALT, sensors, etc...
Test Beam
ASIC functionality test, Flex cable test and electronics slice test
Integration and Testing
Costs and Schedule
Picture of the current TT
IT Upgrade
General:
- Presentation at LHCb Week Cracow, 10-sep-2013, Hans Dijsktra
- Presentation at LHCb Week CERN, 4-jun-2013, Eric Van Herwijnen
- Presentation at LHCb Week CERN, 25-feb-2013, Hans Dijsktra
- Presentation at LHCb Week CERN, 27-nov-2012, Hans Dijsktra
- Presentation at LHCb Week Davos, 4-sep-2012, Hans Dijsktra
- LBD meeting, 26-jun-2012, Hans Dijkstra
- LHCb Upgrade Mini-Workshop on tracker 16-09-2011, Hans Dijkstra
- Presentation at TB 8-Mar-2012, Hans Dijsktra
Silicon modules R&D:
Simulation: