This twiki gives a breakdown of the Storage Setup at every each T1 as collected through a series of GGUS tickets sent around

A preliminary attempt to gather information from the sites about the SRM/SE hardware equipment, software version and setup for LHCb has been done on January 2008 (before CCRC phase-1) GGUS 31800


-- RobertoSantinel - 04 Sep 2008

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2008-09-04 - RobertoSantinel
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback