This twiki gives a breakdown of the Storage Setup at every each T1 as collected through a series of GGUS tickets sent around
A preliminary attempt to gather information from the sites about the SRM/SE hardware equipment, software version and setup for LHCb has been done on January 2008 (before CCRC phase-1) GGUS 31800