This section will summarise the main documents, informations and results of the November 2015 testbeam for EPFL. A fibre based telescope and a BGV module was installed in the testbeam area. The working principle and the geometry will be specified below. The measurement logbook can be found here. The data can be found on the lphe cluster under /panfs/scifi_testbeam/November2015 . The data files were rename to correspond to the software standard. The correspondance can be found here.

The installation for the analysis program on the cluster can be done following this procedure.

Liupan presentation * Telescope_20160127-1.pdf: Telescope_20160127-1.pdf

Installation

2015-11-06_16.46.15.jpg 2015-11-06_16.46.36.jpg

Telescope

The telescope is based on scintillating fibres coupled to SiPMs. The fibres are 10cm long. A mirror is added at on end to increase the light yield The telescope is composed by 5 detection planes (called stations) each composed by two layers (x and y).

Station SiPM X old name SiPM Y old name SiPM X new name SiPM Y new name Uplink X Uplink Y # layer X # layer Y
1 X1=9bis Y1=12 X1=1 Y1=2 100/101 102/103 6 6
2 X2=88 Y2=13 X2=5 Y2=3 104/105 106/107 5 5
3 X3=20 Y3=16 X3=10 Y3=4 120/121 122/123 5 6
4 X4=3 Y4=9 X4=8 Y4=7 124/125 126/127 5 5
5 X5=2 Y5=2bis X5=9 Y5=6 150/151 152/153 5 6

SiPM new name SiPM old name Breakdown voltage [V] # of dead channels
1 9bis 55.726 0
2 12 55.410 0
3 13 55.627 0
4 16 55.133 0
5 88 55.89 2 (2,6)
6 2bis 55.529 0
7 9 55.391 1 (121)
8 3 55.393 2 (122,126)
9 2 55.293 1 (3)
10 20 55.166 1 (67)

FIBRE_BEAM_TELESCOPE_900000_POSITION_MPPC_01.pdf FIBRE_BEAM_TELESCOPE_900000_01.pdf FIBRE_BEAM_TELESCOPE_910000_01.pdf

Light yield and resolutions

List of the light yield of each plane for different runs:

  # layer 2.5 V 3.0 V 3.5 V 4.0 V
X1 6 41.3 46.6 48.7 47.3
Y1 6 37.9 43.6 45.3 47.7
X2 5 32.0 36.9 39.7 42.2
Y2 5 32.2 37.5 41.0 43.5
X3 5 27.1 31.3 35.3 40.2
Y3 6 35.9 41.1 44.2 46.8
X4 5 30.5 34.6 37.0 41.0
Y4 5 34.6 39.3 42.3 44.3
X5 5 31.8 36.2 39.6 42.3
Y5 6 39.1 44.2 47.1 48.0
The following formula is used to determined the proper resolution σy :

(Residual)^2 = σy^2 +σt^2

  • Test_Telescope.jpg:
    Test_Telescope.jpg

The 18 μm track resolution at the central station is estimated through a simulation. The other track resolution are extrapolated from it.

List of the residual, track resolution and proper resolutions of the planes:

Plane name Residual μm at ΔV=3.5V Residual μm at ΔV=2.5V Track resolution μm Proper resolution μm
X1 50 50
X2 40 39
X3 excluded excluded
X4 44 43
X5 55 55
Y1 50 49 39 32.2
Y2 40 41 25 32.2
Y3 36 37 16 32.2
Y4 39 39 22 32.2
Y5 50 49 38 32.2
BGV 59   53 26

BGV

TEST_BEAM_2015_OCTOBRE_90000_01.pdf TEST_BEAM_2015_OCTOBRE_TEST_BGV_01.pdf

Goals

The goals of this testbeam were:

  • Measure the light yield and cluster size of the telescope and the BGV module
  • Get the resolution of the telescope stations
  • Get a track resolution
  • Get the BGV module resolution and hit efficiency

Measurements with electrons at EPFL

We take measurements on station 3 with electrons (5 and 6 layer mats).

  • 2.5, 3.0, 3.5, 4.0V over-voltage
  • Transerve scans

-- AxelKevinKuonen - 2015-11-18

Topic attachments
I Attachment History Action Size Date Who Comment
JPEGjpg 2015-11-06_16.46.15.jpg r1 manage 4321.6 K 2015-11-18 - 11:36 AxelKevinKuonen Telescope
JPEGjpg 2015-11-06_16.46.36.jpg r1 manage 4314.2 K 2015-11-18 - 11:37 AxelKevinKuonen Setup
PDFpdf FIBRE_BEAM_TELESCOPE_900000_01.pdf r1 manage 3056.8 K 2015-11-18 - 11:23 AxelKevinKuonen Fibre Telescope
PDFpdf FIBRE_BEAM_TELESCOPE_900000_POSITION_MPPC_01.pdf r1 manage 1383.5 K 2015-11-18 - 11:23 AxelKevinKuonen Telescope Stations
PDFpdf FIBRE_BEAM_TELESCOPE_910000_01.pdf r1 manage 152.3 K 2015-11-18 - 11:24 AxelKevinKuonen Telescope Stations
Texttxt HOWTO_install_software.txt r4 r3 r2 r1 manage 2.9 K 2015-11-25 - 09:41 OlivierGoranGirard Installation_procedure
PDFpdf TEST_BEAM_2015_OCTOBRE_90000_01.pdf r1 manage 4515.2 K 2015-11-18 - 11:24 AxelKevinKuonen BGV Istallation on the table
PDFpdf TEST_BEAM_2015_OCTOBRE_TEST_BGV_01.pdf r1 manage 1722.5 K 2015-11-18 - 11:27 AxelKevinKuonen BGV Module
PDFpdf Telescope_20160127-1.pdf r1 manage 1050.4 K 2016-04-22 - 11:36 AxelKevinKuonen  
PDFpdf Telescope_Trackresolution.pdf r1 manage 27.0 K 2016-03-04 - 16:34 AxelKevinKuonen Good quality Telescope
JPEGjpg Test_Telescope.jpg r2 r1 manage 56.6 K 2016-03-08 - 09:00 AxelKevinKuonen  
Texttxt log_telescope_bgv_tesbeam112015.txt r1 manage 2.3 K 2015-11-18 - 10:50 AxelKevinKuonen Log file of the November 2015 testbeam
Texttxt logbook_run.txt r2 r1 manage 1.3 K 2015-11-24 - 10:28 AxelKevinKuonen Run_correspondance
Edit | Attach | Watch | Print version | History: r18 < r17 < r16 < r15 < r14 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r18 - 2018-11-27 - BlakeLeverington
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback