Data samples for tracking efficiencies

J/psi method

  Velo efficiency T station efficiency Long track efficiency
Data2010, Reco08 Stripping14 35 pb-1 29 pb-1 29 pb-1
Data2011, Reco10, Stripping13b 339 pb-1 370 pb-1 340 pb-1
MC2010, Reco08 Stripping12,Sim01 Nu2,5, Inc J/psi (w/o prescale) 20 M 20 M 20 M

Note about the 2010 data sample

Unfortunately the first 3-4 pb-1 (from August 2010) in Stripping 14 will not be processed. In this sample we expect to collect most of the Jpsi's due to the Hlt1SingleMuonNoIP trigger (which was not so heavily prescaled yet). This would give a factor of about 5 times more statistics compared to the current sample. The reason that these runs are not processed is that these early runs consists of many files which would cause the staging to interfere with the current productions.

-- JeroenVanTilburg - 08-Jul-2011

Edit | Attach | Watch | Print version | History: r13 < r12 < r11 < r10 < r9 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r13 - 2018-01-15 - LuciaGrillo
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback