Powering the VELO during Shift

During shift we give the VELO to the global commissioning. We retain the High and Low Voltage as we only want VELO experts operating the voltages for the safety of the detector. This will also be true for the Motion and Cooling.

IN PROGRESS

go to the main VELO FSM click dcs click a velo side (both) click lv take control turn on lv release all control do same for other side go back to main panel click hv take control click go_ready (brings it to 100V slowly)

-- KarolHennessy - 15 Aug 2008

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2008-08-15 - unknown
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback