All the hardware on this list must be available by June 6 for installation in North Hall prior to testbeam start

  • 3 double sided modules - Themis
    • 6 complete sets of short kaptons - Themis
    • 3 grounding straps - Themis
    • 6 sets long kapton cables - Eddy
    • 4x6 feed through adaptors - Raymond
    • 3 transport boxes - Themis
  • 6 fully mounted repeater motherboards - Raymond
    • 24 repeater amplifier cards - Jan
    • 2 repeater crates (1 supports 5 hybrids) - Raymond
    • 6 ECS mezzanines - Lars * Only 8 are mounted. * Total need 6 (TB) + 2 (Assembly) + 1 (Lab 15) = 9 * 1 Mezzanine short
    • 6 LV mezzanines - Raymond
    • Front panels - Raymond
  • 24 data cables - Jan
  • 6 control cables - Jan
  • TELL1 crate - Paula
    • comment 05/05/06 - Delivery expected for 12/05/06
    • comment 15/05/06 TELL1 crate delivered to building 15
  • 6 TELL1s -
    • 24 ARX cards - Jan
    • Frontpanels - Raymond
  • Interlock box - Jan
  • LV - Raymond
  • HV - Aldo
  • Control Board - Kazu
    • 2 pre-series CB mounted, one at CERN and one at the VU needed as production reference.
    • 3 prototype CB mounted, not S/W compatible with pre-series.
    • Suggest to use prototype CB in assembly and pre-series in TB.
    • SPECS Master - Kazu
    • SPECS Slave - Kazu
  • Temperature Board - Kazu
    • Three boards mounted = TB + Assembly + Lab 15
    • CAN Master - Kazu
    • ELMB - Kazu
    • CAN cable Kazu
    • Power Supply - Kazu
  • ODIN - Richard
    • 6U VME crate - Paula
    • TTC-tx - Richard
    • Optical Splitter - Richard
    • Optical fibres - Paula
    • GBE board on ODIN - Richard
  • Online infrastructure - Artur
    • HP switch
    • Data Ethernet Cables (1 per TELL1 (6) 24 ideal case)
    • Control Ethernet (1 per TELL1 (6 in total) + ODIN)
  • Module testing box - Ray
  • Manometers/flexible hose to supply nitrogen - Paula
  • Scintillator triggers - JC
  • Electronics + crates for scintillators - Paula
  • Scintillator mechanical support - Ray + ?
  • Racks - Paula
  • Cable pulling equipment (scaffolding) - Paula
  • control room furniture - Paula
  • Wireless/Laptop plugs in North Hall - Niko
  • Operations PC
  • Controls PC
  • Login PC at North Area

-- PaulaCollins - 04 May 2006

Edit | Attach | Watch | Print version | History: r5 < r4 < r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r5 - 2006-06-28 - PaulaCollins
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    LHCb All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback