Welcome to the LHCb Alignment Web Page
Alignment Subtasks
- Conveners: Wouter Hulsbergen and Silvia Borghi
- Alignment software coordination: Johan Blouw
- VELO alignment
: Silvia Borghi (convener), Marco Gersabeck, Chris Parkes
- TT alignment: Jeroen van Tilburg, Christophe Salzmann
- IT alignment: Matthew Needham, Adlene Hicheur, Louis Nicolas, Vincent Fave, Florin Maciuc
- OT alignment: Johan Blouw, Jan Amoraal, Marc Deissenroth
- Muon alignment: Stefania Vecchi, Silvia Pozzi
- RICH Alignment: Antonis Papenestis
- Global alignment
: Steven Blusk
- AlignmentMonitoring
- AlignmentOpenIssues
- Alignment problems database
Tools for Alignment
How To:
Data sets
LHCb Tracking & Alignment Workshops and Other Relevant Meetings
- April 7-11, 2008: Alignment working week 3 @ CERN
- Feb 27-29, 2008: Tracking & Alignment Workshop @ Ferarra
- Feb 11-15, 2008: Alignment Working Week 2 @ CERN
- Jan 7-11, 2008: Alignment Working Week 1 @ CERN
- Aug 29-31, 2007: Tracking & Alignment Workshop @ Amsterdam
- Aug 3, 2007: Alignment Meeting @ CERN
- Feb 22-23, 2007: Tracking & Alignment Workshop @ Heidelberg
- Nov 8-9, 2006: Tracking & Alignment Workshop @ Lausanne
- July 13-14, 2006: Tracking Workshop @ Zurich
- Jan 12-13, 2006: @ Alignment Workshop @ Cambridge
- Oct 31-Nov 1, 2005: Tracking & Alignment Workshop @ Glasgow
LHC Detector Alignment Workshops
Presentations
Publications, public notes
- J. Amoraal, "Alignment of the LHCb detector with Kalman filter fitted tracks." LHCb-CONF-2009-026; CERN-LHCb-CONF-2009-026
- M. Deissenroth, "Experience with LHCb alignment software on first data" LHCb-CONF-2009-009; CERN-LHCb-CONF-2009-009
- A. Hicheur, M. Needham, L. Nicolas, , J. Amoraal, W. Hulsbergen, G. Raven, , "First studies of T-station alignment with simulated data.", CERN-LHCB-2008-065, Mar 2009. 35pp.
- L. Nicolas, A. Hicheur, M. Needham, J. Amoraal, W. Hulsbergen, G. Raven, "Alignment of LHCb tracking stations with tracks fitted with a Kalman filter", CERN-LHCB-2008-066, LPHE-2008-14, Dec 2008. 6pp.
- W. Hulsbergen, "The Global covariance matrix of tracks fitted with a Kalman filter and an application in detector alignment.", Nucl.Instrum.Meth.A600:471-477,2009. [doi:10.1016/j.nima.2008.11.094 ], arXiv:0810.2241 [physics.ins-det]
- S. Viret, C. Parkes, M. Gersabeck, "Alignment procedure of the LHCb Vertex Detector", Nucl. Instr. and Meth. A596 (2008) 157-163, doi:10.1016/j.nima.2008.07.153 [arXiv:0807.5067]
- M. Gersabeck et al., "Performance of the LHCb Vertex Detector Alignment Algorithm determined with Beam Test Data", Nucl. Instr. and Meth. A596 (2008) 164-171, doi:10.1016/j.nima.2008.07.154 [arXiv:0807.5069]
Recent LHCb notes
Subset of relevant non-lhcb references
Hardware Alignment Systems
- RASNIK system:
- RICH Laser Alignment System
Alignment Working Week Tests
* Data used: minimum bias on beam-gas events at 450GeV,
- reconstructed with tag DC06-repro0710: /castor/cern.ch/user/j/jblouw/FieldOff_450GeV.dst
- reconstructed with tag AW2_IT_OT_01 : castor/cern.ch/user/j/jblouw/FieldOff_450GeV_AW2_IT_OT_01.dst
* Tags in the conditions dbase (/castor/cern.ch/user/j/jblouw/LHCBCOND.db) with shifts/rotations of layers:
Det |
dbase-tag |
Tx |
Ty |
Tz |
Rx |
Ry |
Rz |
OT |
AW2_IT_OT_01 |
1.0mm |
1.0mm |
fixed |
fixed |
0.4mrad |
0.4mrad |
IT |
AW2_IT_OT_01 |
0.1mm |
0.1mm |
fixed |
fixed |
0.1mrad |
0.1mrad |
OT |
AW2_OT_IT_03 |
1.0mm |
fixed |
fixed |
fixed |
0.4mrad |
0.4mrad |
IT |
AW2_OT_IT_03 |
0.1mm |
fixed |
fixed |
fixed |
1.0mrad |
1.0mrad |
OT |
AW2_OT_IT_04 |
1.0mm |
fixed |
1.0mm |
0.4mrad |
fixed |
0.4mrad |
IT |
AW2_OT_IT_04 |
0.1mm |
fixed |
fixed |
1.0mrad |
fixed |
1.0mrad |
Note that for all cases, the first 2 and last 2 layers have not been shifted/rotated.
--
StevenBlusk - 13 Nov 2006