CMS GEM Collaboration Hardware Tracking Page
Introduction
The information below serves as a documentation of the hardware (both chambers and electronics) owned by the GEM collaboration (both at CERN and various institutes). We hope that this information helps with the planning and tracking of future experimental activities.
Only members of the
"cms-gem-hw-tracking" e-group may edit this page. To become a member of the e-group please go to this
link
and search for
"cms-gem-hw-tracking" and click the
"subscribe" button. Then send an email to
Brian Dorney asking for access to the e-group. Once you have access please only alter the information below for those items which you are involved in.
GE1/1 Prototype Information Tables
The table below gives summary information regarding each prototype. Note as some hardware pieces (i.e. GE1/1-VI-L & S, GEB-V2-S, GEB-V3-L & S) are still in the design phase, the following information is subject to change. We shall update this information as needed.
The HV dividers described in the summary table above are illustrated in the table below:
HV Dividers |
Custom |
Ceramic |
Multichannel |
|
|
Design Pending |
The production technologies (Prod. Tech.) are illustrated in the summary table below:
Production Technologies |
SG (Spaces & Glue) |
NS2-V1 |
NS2-V2 |
|
|
|
GE1/1 Generation I Information Table
The table below tracks experimental usage and results of the generation I prototypes
GE1/1-I Experimental Inventory |
|
GE1/1 Generation II Information Table
The table below tracks experimental usage and results of the generation II prototypes
GE1/1-II Experimental Inventory |
|
GE1/1 Generation III Information Table
The table below tracks experimental usage and results of the generation III prototypes
GE1/1-III Experimental Inventory |
|
GE1/1 Generation IV Information Table
The table below tracks experimental usage and results of the generation IV prototypes
GE1/1-IV Experimental Inventory |
|
GE1/1 Generation V Information Table
The table below tracks experimental usage and results of the generation V prototypes
GE1/1-V Experimental Inventory |
|
GE1/1 Generation VI Information Table
The table below tracks experimental usage and results of the generation VI prototypes
GE1/1-VI Experimental Inventory |
|
GEM Electronics Board Prototype Information Tables
The table below gives summary information regarding each prototype. Note as some hardware pieces (i.e GEB-V2-S, GEB-V3-L, GEB-V3-S) are still in the design phase the following information is subject to change. We shall update this information as needed.
GEM Electronics Board R&D Summary Table |
|
GEB-V1 Information Table
The table below tracks experimental usage and results of the GEB-V1 prototype(s).
GEB-V1 Experimental Inventory |
|
GEB-V2 Information Table
The table below tracks experimental usage and results of the GEB-V2 prototype(s).
GEB-V2 Experimental Inventory |
|
GEB-V3 Information Table
When the GEB-V3 is produced there will be a table below that tracks experimental usage and results of the GEB-V3 prototype(s). For now this is just a placeholder.
CMS VFAT Prototype Information Tables
TOTEM VFAT2 Information Table
The table below tracks TOTEM VFAT2 strip hybrids, each hybrid is capable of reading 128 channels.
TOTEM VFAT2 Strip Hybrid Information Table |
|
The table below tracks TOTEM VFAT2 pad hybrids. Each hybrid is capable of reading 123 channels; several strips on the right and left of the panasonic connector are grounded.
TOTEM VFAT2 Pad Hybrid Information Table |
|
CMS VFATv2B Information Table
The table below tracks experimental usage of the CMS-VFATv2B hybrids.
CMS VFAT3 Information Table
Once the VFAT3 is produced there will be a table below that tracks experimental usage of the hybrids. For now this is just a placeholder.
CMS Optohybrid Prototype Information Tables
The table below gives summary information regarding each prototype. Note as some hardware pieces (i.e OH-V2, OH-V3) are still in the design phase the following information is subject to change. We shall update this information as needed.
Optohybrid R&D Summary Table |
|
OH-V1 Information Table
The table below tracks experimental usage of the OH-V1 prototype(s).
OH-V1 Experimental Inventory |
|
OH-V2 Information Table
When the OH-V2 is produced there will be a table below that tracks experimental usage of the OH-V2 prototype(s). For now this is just a placeholder.
OH-V3 Information Table
When the OH-V3 is produced there will be a table below that tracks experimental usage of the OH-V3 prototype(s). For now this is just a placeholder.
GLIB Information Table
The table below tracks the location and usage of the GLIBs owned by the CMS GEM community:
CTP7 Information Table
The table below tracks the location and usage of the CTP7s owned by the CMS GEM community:
uTCA Information Table
The table below tracks the location and usage of the uTCA components owned by the CMS GEM community: