PatriziaBarria - 11 Apr 2014
TEST BEAM ACTIVITY @FNALOct
2013
--
VallaryBhopatkar - 11 Apr 2014
FLYSUB consortium (
Florida Tech,
Yale University,
Stony Brook
University, Univ. of Virginia, and
Brookhaven National lab) performed beam test at FNAL in Oct 2013. Beam test was conducted at MT6 station in meson test beam area. There were 19 detectors had been tested in this beam. Florida Tech and Univ. of Virginia were using same station for testing 10 different GEM detectors. The details are as follows:
Florida Tech: 1 (10cm x 10cm) GEM detectors (as a Tracker), 1 (1m long) CMS large area prototype III GEM detector, 1 (30cm x 30cm) GEM detector with
ZigZag readout, 2 (10cm x 10cm) GEM detectors with Zigzag readout.
Univ. of Virginia: 2 (10cm x 10cm) GEM detectors (as Tracker), 1 ( 50cm x 50cm) GEM detector (as a Tracker), 1 ( 50cm x 50cm) GEM detector, 1 (1m long) GEM detector with (UV readout)
All trackers had 2D readout board with internal gap configuration 3/2/2/2mm
CMS GEM had internal gap configuration 3/1/2/1 mm
Gas mixture used in all detectors: Ar/CO
2 70:30
Beam Energy used 120GeV Proton beam, 35GeV Mixed hadron beam (CMS Measurements)
We used DATE (DAQ from Alice) to take data with RD51 SRS system through APV 25 hybrid chip and data analyzed by AMORE package(FL Tech version).
Beam test schedule (Oct2- Oct22)
Sep 27 - Sep 29
Detectors were tested before installing in the beam line
Sep 29 - Oct 1 Detectors installation in beam line as well as all electronics setup
Oct 2 - Oct 22 Beam test
Oct 8 Patrizia arrived at Fermilab to join FL Tech group in beam test efforts
Oct 10 – Oct 22 CMS detector was tested in beam
All pedestal files were taken at 2000V for all detectors and each file contained 5K events.
During data taking all trackers were set at 4000V
CMS GEM detector measurements:
-
High Voltage Scan: Voltage range 2900V – 3350V
Each file has 15K
-
Position Scan: Operating Voltage 3320V
Data was taken at three different APV position
1. Upper APV 2. Middle APV 3. Lower APV
Each file contains 15K events
-
High Statistic Data: Operating Voltage 3320V
Four Data files, each with 100k events. Last run was not finished due to the beam loss
(Note: Run 2-3 have most uncorrelated events, we are still exploring the data)
--
VallaryBhopatkar - 11 Apr 2014
11/10/2013 10:00 am
- Check gas: Ar/CO2 (70:30) has 1800psig, Ar/CO2 (80:20) has 1800psig
- Gas flowing rate ~25 unit (from flow meter)
- Apply voltages to all detectors, wait for the beam
- detectors seem all in good condition
11/10/2013 5:45 pm
- Beam is back, 32GeV mixture hadrons, rate ~460 counts/spill, not as stable as expected
- Take new run 001 Pedestal (5k Events)
- Rate from DATE is 2000 events/spill
- Time window=9
- HV setting as below
Detectors |
HV |
Tracker 2 (Uva 10cm) |
1800 |
Tracker 3 (Uva 10cm) |
1800 |
SBS1 (Uva 50cm) |
1800 |
Solid/EIC (Uva 1m) |
1800 |
CMS/EIC zz (FIT) |
1600 |
S4 (FIT 30cm) |
2000 |
10cm zz 2 (FIT) |
2000 |
10cm zz 1 (FIT) |
2000 |
Tracker 4 (Uva 50cm) |
1800 |
Tracker 1 (FIT 10cm) |
1100 |
11/10/2013 9:30 pm
- changeTime window=6
- set time delay in FEC for each detector
IP (FEC#) |
Time Delay |
10.0.5.2 (FEC |
From 60 to 63 |
10.0.3.2 (FEC4) |
From 60 to 62 |
10.0.1.2 (FEC3) |
60 |
10.0.10.2 (FEC5) |
60 |
- start taking real data: New Run 001 (25k events)
- Rate from DATE is 400 events/spill
- HV setting as below
Detectors |
HV |
Tracker 2 (Uva 10cm) |
1800? |
Tracker 3 (Uva 10cm) |
3950 |
SBS1 (Uva 50cm) |
4125 |
Solid/EIC (Uva 1m) |
4100 |
CMS/EIC zz (FIT) |
3150 |
S4 (FIT 30cm) |
4150 |
10cm zz 2 (FIT) |
4050 |
10cm zz 1 (FIT) |
4050 |
Tracker 4 (Uva 50cm) |
4100 |
Tracker 1 (FIT 10cm) |
4100 |
- take New Run 002 Pedestal (5k events): beam intensity higher and stable
- last run recorded as the 1st point of 10cm zz's
- table moved 3.5 cm up (vertically), then 3.5 east (horizontally) so the beam hit in 2nd point in the frame below
- Take data fro 2nd point as Run 002 LUP (35K events), 6 time window
12/10/2013 12:36 am
- table moved 7 cm west (horizontally), take data for 3rd point as New Run 003 LRP (35k events), 6 time window
12/10/2013 1:39 am
- table moved 7 cm down (vertically), take data for 4th point as New Run 004 DRP (35k events), 6 time window, Trigger rate 5951/spill, DATE rate 673/spill
12/10/2013 2:39 am
- table moved 7 cm est (horizontally), take data for 5th point as New Run 004 DUP (35k events), 6 time window