-- AmnonHarel - 14-Oct-2010

Unless stated differently, line numbers refer to "v4" of the paper draft.

Saving space

59-61 I believe you can drop these details - as said by Brajesh, not obvious to the reader, but also not necessary for the understanding of the paper

84-85 - change text to: the default choice of (mR, mF) = (pT, pT) to the following six combinations (pT/2, pT/2), (2pT, 2pT), (pT, pT/2), (pT, 2pT), (pT/2, pT), and (2pT, pT).

85-86 you could shorten as The PDF uncertainties, (replace "are" by comma) estimated USING (drop repeated evaluations of the NLO-predicted R h for the PDFs in) the CTEQ-6.6, MSTW2008 [27], and NNPDF2.0 [28] sets, (comma)  and are found...

Uses for more space

Specify the turn offs for selected points (3 & 4TeV were suggested)

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2010-10-14 - AmnonHarel
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback