• Shipped from LBNL and arrived at CERN on 22/11/2005.
  • PRM v17f preinstalled at LBNL
  • Acceptance tested on 16 January 2006.
  • Installed in USA15 on 8 March 2006.
  • Removed from USA15 on 13 March 2007 due to error in sending events to S-link. Replaced by S/N 045.
  • Sent to LBNL for repair on 4 May 2007.
  • Sent back to CERN on 25 May 2007 - failed U49 buffer chip replaced.
  • Acceptance tests redone on 6 June 2007.

-- JohnHill - 06 Jun 2007

Edit | Attach | Watch | Print version | History: r5 < r4 < r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r5 - 2007-06-06 - JohnHill
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback