tem---++ vidyo New vidyo room: (old vidyo room: vidyo link PIN 1055)

News:

Returning money to GR1, just travel money from our side. Need to find candidate for the RN role. Please send nominations to Roberto Rossin

Framework & production

Transition of physical nodes to CENTOS started

Analysis

B physics

Alberto: sent the draft of the Answer to the referee was sent to the ARC. This week it should be forwarded to the referee.

Heavy composite neutrinos

VBS

WH_SS

Same sign dileptons

EPR

Plans in CMS to reduce to 70% the EPR due to CMS.

Trigger

Detector

DT

Timing Layer

Purchase of material going on. The opening of the AT position should be official in a few day.

Tracker/tracking

Working w/ Luca to get the petal from Germany for the museum. Luca nd Pepato should put the strup module on the petal and build the box for the exposition Tracking POG: phase2 dedicated meeting on segment linking, XFT-like (developed in CDF for the COT) Timeline for data-taking: 2021: there will be circulating beam but not stable beam.

A.O.B.

Andrea Gozzellino: new RC deputy coordinator for DT. Tommaso: Co chair of the thesis award committee. Tommaso: organizing differentiable computing, -- RobertoRossin - 2020-09-22
Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2020-09-22 - RobertoRossin
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback