Action Items:
News:
Tom : Should we maintain minutes ? Yes.
Paolo : Timing Layer Days 22nd and 23rd March. Massimo is going there for one day. The detector was approved by the LHCC and research board.
TDR due in ~ one year.
Anna : workshop at CERN on slice test for DT upgrade on Wed. 14th (wukl be held during long shutdown).
One week test beam at the gif++ on irradiated MB2 chamber (25 april , may 2).
Experienced shifters are needed.
Paolo : EPR ? Yes.
Framework & production
Analysis
B physics
Martino : Alessio will presente the L1 trigger paths strategy at the DPG today.
Alberto : soft muon ID implementaion on course. My comments from the responsible, should coneverge quite soon.
Franco : will we have something by the brussels internal meeting ? Yes (A).
Charged Higgs to top-beauty
No news.
Dibosons, VZ resonance (V=W,Z)
Lisa' analysis (2q2nu) submitted to JHEP. Final reading for 2l2q on Thursday, working in order to prepared a full compilation of searches.
4B full hadronic
Move to standard model BDT, last step before preapproval. Limits got worse, we are within 2 sigmas.
Heavy New Fermions
LHE production for Heavy Neutrino at 14TeV approved by EXO-MC convener. LHE being processed with Delphes+Pythia by UPSG (0PU already available).
Higgs Dark Matter
Siew Yan : sensitivity in 2016 , 2017: need to perfrom analysis also on 2017. SY works on documentation and a proxy analysis on the monojet, then (by fall) will move away keeping just a managerial role. Move to higgssthrhahllung.
Same sign dileptons
EPR
Roberto is on shift (even on Eater !)
Marina : explore the possibily to be FOG coordination from remote.
Trigger(less)
Jacopo : worked with Andrea Triossi. Firmware assembled, but the Spanish guys asked for a different setup. Wrapping the unpacker is a bit delayed, by end this week
the two parts should start to be integrated.
Detector
DT : ongoing preparation for pp collisions. MB1 chambers on the external wheel will run at lowr voltage (3550, 3500 ) to drive less current with unaffected efficiency.
Also sheild on top MB4 chambers of all wheels.
Luminosity & Bril
Timing Layer
Tracker:
Paolo : what's the status with the inner layer problem (DC/DC converter issue) ? Not solved as far as I know (Jacopo).
Will be discussed during the CMS week.
A.O.B.:
--