vidyo

New vidyo room:

(old vidyo room: vidyo link PIN 1055)

News:

Budgets:

Roberto requests for more money (30k) for travel for extra expense for travel to cern perform test beam activities. Suggestion on saving travel money.

37k for money consumer (hardware funds).

10k for CERN

EPR:

SLICE test opens up EPR, propose a month for SLIDE test at cern. June-July data taking started. Proposed Sandro to present an overview on SLICE test.

Framework & production

Discussion with cluster, 27k for this year, we cannot spend all to lustre.

Federica proposed 16k

Tommaso suggests 16k to be burdened by several gruppo

Lustre has potential problem with filesystem breakdown, if its happen we need to build the system again.

Matteo requested transfer of ntuple samples (VBS) which is missing from DBS to Legnaro T2. Transfer met with certificate issue via interface transfer. The need of CPU resources too.

Analysis

B physics

Paolo give a talk on spectroscopy results.

PAG working on the preparation on RUN3, Martino will be visiting in Imperial college (upcoming B physics workshop). B parking use

Mini jamboree will be expected on 1/2 July on B parking use. study on high PU in RUN3 with Mia will be discussed. Alesso studied on B-physics trigger on RUN3.

Kai studies on dataset RUN1 coventured with another effort (canada) on dataset RUN2, last summer has two cadi line, two results were not in agreement. proposal to merge two analysis, effort is started (Kai).

For some political issue, its stalled, now its restarted. Measures double epsilon. Chinese group from fermilab works on 2017 dataset in progress.

Heavy New Physics

Defines analysis strategies, and signal samples request for 2016,2017 analysis.

VBS

no news.

VH SM

Same sign dileptons

EPR

EPR:

SHERPA

Alberto pledged 4 for HLT

Hevjin took a EPR task on tracking Validation.

Reberto pledge 6 months for Nicola (2 months) and Fabia (4 months) --> trigger algorithm for level-1 task.

Trigger(less)

Detector

DT

Level-1 phase 2 dataformat discussed.

Reberto generates out of time PU, 16 BX vs 18 BX, bottom line system works.

Timing Layer

Tracker

A.O.B.

Aging Study:

Presented today about figure to be included for L1 trigger for the GIF.

Efficiency depends on instan. luminosity.

-- SiewYanHoh - 2019-05-13


This topic: Main > WebPreferences > CMSPDAnalysis > CMSPDAnalysis130519
Topic revision: r2 - 2019-05-13 - SiewYanHoh
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback