New vidyo room:

News:

Call for nominations deadline february 8th.

Framework & production

Federica: moving to condor as batch system: plan for local production of events than need LSF local batch system for the process. LSF will be maintained for just one month or two.

Analysis

B physics

Discussing with the ARC draft of answers to the second iteration of referee comments.

Heavy composite neutrinos

Patrizia: finishing answers to the requests raised during the approval. Matteo thesis: one reader has minor comments.

VBS

Note sent during holidays. presentation at the group soon. publication strategy to be discussed.

WH_SS

Ugo: SY is writing the thesis, meeting with Alberto last week to define the timescale. All the ingredients of the thesis are there. Analysis unblinded and under review for the preapproval.

H/Z->JPsi gamma

Alberto: presentation very smooth last week. Iterating with Matteo to start the production officially. Rocco working on this item.

EPR

Detector

Trigger

Jacopo: couple of bugs in the firmware discovered and solved. Now good zero distributions. Ask for a slot soon for a presentation to discuss what has been done during the last months. Migliorini will be the speaker.

Timing Layer

Roberto C.: primo meeting usualmente luned́` mattina alle 10. cominciare a fare l'implementazione strumentale del laboratorio al primo piano . Si mettere` il frigorifero e altro a breve. Sandro sta facendo il meccanismo di lettura. Possibili argomenti per tesi triennali di ingegneria (misurare trasmissione termica,...).

DT

Sandro: No news: production of version 2 prototypes just started. Maintenance slowing recovering at P5.

Tracker/tracking

Mia: usual meeting with the pubcomm for discussing publication plan for tracking POG.

Enrico (EPR task): still working on the addition of tracking info to the Mini aod. Instead of adding infos to the Mini, try to use the existing compression scheme to get some very low quality but reasonable numbers for the covariance matrix of the tracks pT<0.5 GeV for BPH. Idea: use directly the look up tables instead of increasing the size of the miniAOD. Approach currently used for B-parking data, to be studied for Run3.

A.O.B.

Paolo: riunione per eleggere un rappresentante INFN di sezione. Ruolo con importanza. Alberto e Jacopo potenziali candidati. Preferibili candidati INFN.

-- MartinoMargoni - 2021-01-19

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2021-01-19 - MartinoMargoni
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback