contracts of strip adaptors

contracts of pad adaptors

  • for L3 (and part of stripAB for L2): 97400

contracts of wire1 adaptors

  • 37610: third part diodes and capacitors resistors (first 4 items in table)

  • 95558: wire0 board for L1 and part of wire1 boards

  • 98670: main wire1 boards

contracts of wire2-pAB cable

  • 41000: part of L3 and connector Mounting

adaptor prototypes

  • Fouth_sample_28980, components_on_boards_30314.8: samples of S2 wire1, can't use, design is wrong. Components include diodes, resistors, capacitors, which are the first 4 rows in the contract. The low part are not relative to sTGC project.

  • Sixth_sample: Sixth_adaptor_samle: S2 wire2-pAB prototypes and 982 pad adaptor connector_mounting

L2 FR4 parts:

L3 FR4 parts

transportation and insurance

The link not available means the relative insurance or invoice are missing somewhere.

  • Invoice, insurance: strip adaptor from first adaptor samples to Israel

  • Invoice, insurance: pad/strip adaptor from second adaptor samples to Canada

  • Invoice, insurance: pad/strip adaptor from second adaptor samples to Chile

  • invoice, no insurance: 2017: some wire1 board prototype to canada (Carlton/McGill?)

  • Invoice, insurance: 2017-12, transportation of L1 pad/strip prototypes from the fifth sample to Israel

  • invoice, insurance: remade part of S3 FR4 parts to TRIUMF

  • invoice, insurance: 2018-1: 40 S3 strip board to canada

  • invoice, insurance: 2017: 80 S3 strip board to Israel

  • invoice and details to send wire1 adaptors to CERN/Russia (2018-4-23)

  • 1550: packing for L3 FR4 parts, L2 FR4 parts, L2 honeycomb frames (last 3 items in table)

  • invoice+tax and details transportation and tax for picking up 1600 connectors for wire2-pAB cable from CERN

  • invoice and details
    • 1000 RMB at row 2: sending wire2-pAB cables to Chile
    • 5080 RMB at row 3: sending L2 strip adaptors and L2/S3 wire2-pAB cables to Canada
    • 8886 RMB at row 1:sending L1 strip adaptors and L2/S3 wire2-pAB cables to Israel
    • row 4 is to retrieve wire2 board of S2, which is China duty.
  • invoice 4716 and detail for Fedex sending of L2 HC frames to Canada
  • invoice+tax and details transportation of wire2 adaptors of L3 to CERN
  • invoice and details for sending part of Wire2-padAB cables to Israel, Canada and Russia(CERN)
    • 614 in row one is to send last part of S3 wire2-pAB cables to Israel
    • 1129 in row two is to send last part of L3 wire2-pAB cables to Russia via CERN
    • 567 in row three is to send last part of S3 wire2-pAB cables to Canada

Other orders:

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf 20191010102137437_HC20191000368-new.pdf r1 manage 388.5 K 2019-11-21 - 16:31 ChengguangZhu  
PDFpdf 20191120220457842_XW190508-0035.pdf r1 manage 665.9 K 2019-11-21 - 17:13 ChengguangZhu  
PDFpdf Contract-padAB-112L-L1-stripAB-353L-L3.pdf r1 manage 344.1 K 2018-04-18 - 05:49 ChengguangZhu  
PDFpdf Contract-padAB-112R-L1-stripAB-353R-L3.pdf r1 manage 208.6 K 2018-04-18 - 05:49 ChengguangZhu  
PDFpdf Contract-padAB-42-S3.pdf r1 manage 259.2 K 2018-04-18 - 05:48 ChengguangZhu  
PDFpdf Contract-padAB-70-L3-stripAB-366-L2.pdf r1 manage 315.6 K 2018-04-18 - 05:48 ChengguangZhu  
PDFpdf Contract-padadaptor70-stripadaptor366.pdf r1 manage 315.6 K 2018-04-16 - 11:16 ChengguangZhu  
PDFpdf Contract-stripAB-353L-L3.pdf r1 manage 305.7 K 2018-04-18 - 05:49 ChengguangZhu  
PDFpdf Contract-stripAB-353R-L3.pdf r1 manage 305.9 K 2018-04-18 - 05:49 ChengguangZhu  
PDFpdf Contract-stripAB-366-L2.pdf r1 manage 306.3 K 2018-04-18 - 05:49 ChengguangZhu  
PDFpdf Contract-stripAB-408L-L1.pdf r1 manage 305.9 K 2018-04-18 - 05:49 ChengguangZhu  
PDFpdf Contract-stripAB-408LR-L1.pdf r1 manage 307.0 K 2018-04-18 - 05:49 ChengguangZhu  
PDFpdf Contract-stripAB-408R-L1.pdf r1 manage 305.6 K 2018-04-18 - 05:49 ChengguangZhu  
PDFpdf Contract-stripadaptor366-1.pdf r1 manage 306.3 K 2018-04-16 - 11:16 ChengguangZhu  
PDFpdf Contract-wire2-pAB-L1L2.pdf r1 manage 347.4 K 2018-04-18 - 05:49 ChengguangZhu  
PDFpdf Contract-wire2-pAB-L3-and-connectorMounting.pdf r1 manage 259.6 K 2018-04-18 - 05:50 ChengguangZhu  
PDFpdf Contract-wire2-pAB-L3.pdf r1 manage 258.0 K 2018-04-18 - 05:50 ChengguangZhu  
PDFpdf Contract-wire2-pAB-S1S2S3.pdf r1 manage 349.4 K 2018-04-18 - 05:50 ChengguangZhu  
PDFpdf Contract1.pdf r1 manage 1547.8 K 2020-01-29 - 17:24 ChengguangZhu  
PDFpdf Contract10setsL1.pdf r1 manage 1515.7 K 2020-07-07 - 11:15 ChengguangZhu  
PDFpdf Contract2.pdf r1 manage 1546.1 K 2020-01-29 - 17:24 ChengguangZhu  
PDFpdf Contract300wire1.pdf r1 manage 1520.8 K 2020-07-07 - 11:15 ChengguangZhu  
PDFpdf Contract5setsS3.pdf r1 manage 1520.4 K 2020-07-07 - 11:15 ChengguangZhu  
PDFpdf Contract_L2_honeycomb_frame-20180301_.pdf r1 manage 259.3 K 2018-03-07 - 18:09 ChengguangZhu  
PDFpdf Contract_Pad_adaptor_075L.pdf r1 manage 348.2 K 2018-03-07 - 16:36 ChengguangZhu contract of pad/strip adaptors of small wedge of NSW
PDFpdf Contract_Pad_adaptor_075R.pdf r1 manage 1559.0 K 2018-03-07 - 16:36 ChengguangZhu contract of pad/strip adaptors of small wedge of NSW
PDFpdf Contract_diodes-1.pdf r1 manage 512.7 K 2018-03-07 - 16:56 ChengguangZhu  
PDFpdf Contract_diodes-2.pdf r1 manage 513.7 K 2018-03-07 - 16:56 ChengguangZhu  
PDFpdf Contract_stripAB_S1_406-2.pdf r1 manage 308.6 K 2018-03-07 - 16:36 ChengguangZhu contract of pad/strip adaptors of small wedge of NSW
PDFpdf Contract_stripAB_S1_406L-1.pdf r1 manage 306.7 K 2018-03-07 - 16:36 ChengguangZhu contract of pad/strip adaptors of small wedge of NSW
PDFpdf Contract_stripAB_S1_406R-1.pdf r1 manage 306.4 K 2018-03-07 - 16:36 ChengguangZhu contract of pad/strip adaptors of small wedge of NSW
PDFpdf Contract_stripAB_S2_365-1.pdf r1 manage 221.3 K 2018-03-07 - 16:36 ChengguangZhu contract of pad/strip adaptors of small wedge of NSW
PDFpdf Contract_stripAB_S2_365-2_.pdf r1 manage 221.7 K 2018-03-07 - 16:36 ChengguangZhu contract of pad/strip adaptors of small wedge of NSW
PDFpdf Contract_stripAB_S3_307-1.pdf r1 manage 306.1 K 2018-03-07 - 16:36 ChengguangZhu contract of pad/strip adaptors of small wedge of NSW
PDFpdf Contract_stripAB_S3_307-2.pdf r1 manage 305.8 K 2018-03-07 - 16:36 ChengguangZhu contract of pad/strip adaptors of small wedge of NSW
PDFpdf Fifth_adaptor_sample_408RL_112RL.pdf r1 manage 313.8 K 2018-03-07 - 16:56 ChengguangZhu  
PDFpdf First_adaptor_sample_-365sAB.pdf r1 manage 338.5 K 2018-03-07 - 16:56 ChengguangZhu  
PDFpdf Fouth_adaptor_sample_-splitted_wire1.pdf r1 manage 507.6 K 2018-03-07 - 16:56 ChengguangZhu  
PDFpdf Fouth_adaptor_sample_-splitted_wire1_diodes.pdf r1 manage 528.3 K 2018-03-07 - 17:21 ChengguangZhu  
JPEGjpg IMG_20180831_143103.jpg r1 manage 1183.2 K 2018-09-03 - 08:08 ChengguangZhu  
JPEGjpg IMG_20180831_143115.jpg r1 manage 1507.4 K 2018-09-03 - 08:08 ChengguangZhu  
JPEGjpg IMG_20181023_235517.jpg r1 manage 1242.7 K 2018-10-23 - 18:13 ChengguangZhu  
JPEGjpg IMG_20181023_235621.jpg r1 manage 1133.1 K 2018-10-23 - 18:13 ChengguangZhu  
JPEGjpg IMG_20181128_150558.jpg r1 manage 1564.9 K 2018-11-28 - 08:12 ChengguangZhu  
JPEGjpg IMG_20181128_150612.jpg r1 manage 1555.0 K 2018-11-28 - 08:12 ChengguangZhu  
PDFpdf L2-HV-cover-1.pdf r1 manage 260.7 K 2018-04-11 - 05:29 ChengguangZhu  
PDFpdf L2_HV_cover_T-shape-2.pdf r1 manage 262.8 K 2018-04-11 - 05:29 ChengguangZhu  
PDFpdf L2_HV_ruler-1.pdf r2 r1 manage 268.9 K 2018-04-11 - 05:13 ChengguangZhu  
PDFpdf L2_HV_ruler-2.pdf r2 r1 manage 265.8 K 2018-04-11 - 05:13 ChengguangZhu  
PDFpdf L2_T-shape-1.pdf r1 manage 259.3 K 2018-04-11 - 05:29 ChengguangZhu  
PDFpdf L3-HVcover-long-short.pdf r1 manage 1611.5 K 2018-03-07 - 16:57 ChengguangZhu  
PDFpdf L3-HVcover-side.pdf r1 manage 1605.4 K 2018-03-07 - 16:57 ChengguangZhu  
PDFpdf L3-HVruler-long.pdf r1 manage 1588.2 K 2018-03-07 - 16:57 ChengguangZhu  
PDFpdf L3-HVruler-short.pdf r1 manage 1589.9 K 2018-03-07 - 16:57 ChengguangZhu  
PDFpdf L3-Hvruler-side-92800-paid.pdf r1 manage 227.0 K 2018-03-07 - 16:57 ChengguangZhu  
PDFpdf L3-T-shape-long_.pdf r1 manage 1598.0 K 2018-03-07 - 16:57 ChengguangZhu  
PDFpdf L3-T-shape-short-84000-paid.pdf r1 manage 220.9 K 2018-03-07 - 16:57 ChengguangZhu  
PDFpdf S3-pad-adaptor042-contract.pdf r1 manage 259.2 K 2018-04-16 - 10:12 ChengguangZhu  
JPEGjpg S3_strip_board_to_Israel.jpg r1 manage 1208.2 K 2018-03-07 - 17:34 ChengguangZhu  
PDFpdf S3_strip_board_to_canada_insurance.pdf r1 manage 1519.0 K 2018-03-07 - 17:34 ChengguangZhu  
PDFpdf Second_adaptor_sample.pdf r1 manage 2111.9 K 2018-03-07 - 16:56 ChengguangZhu  
PDFpdf Sixth_adaptor_samle-S2_cable_and_pad_adaptor_connector_mounting-20180329.pdf r1 manage 350.3 K 2018-03-29 - 03:59 ChengguangZhu  
PDFpdf Third_adaptor_sample_-long_wire1.pdf r1 manage 357.1 K 2018-03-07 - 16:56 ChengguangZhu  
JPEGjpeg WechatIMG1586.jpeg r1 manage 95.0 K 2021-01-29 - 09:52 ChengguangZhu  
JPEGjpeg WechatIMG235.jpeg r1 manage 2549.8 K 2019-11-21 - 16:01 ChengguangZhu  
JPEGjpeg WechatIMG236.jpeg r1 manage 2172.3 K 2019-11-21 - 16:01 ChengguangZhu  
JPEGjpeg WechatIMG476.jpeg r1 manage 4576.5 K 2021-01-29 - 09:25 ChengguangZhu  
PDFpdf contractCa.pdf r1 manage 407.0 K 2019-10-26 - 03:45 ChengguangZhu  
JPEGjpeg detail2020-04-17.jpeg r1 manage 106.8 K 2020-05-07 - 16:29 ChengguangZhu  
JPEGjpg detail_canada_L2_FR4_parts.jpg r1 manage 1496.9 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg detail_canada__wire1_adaptor.jpg r1 manage 1484.8 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg detail_chile__wire1_adaptor.jpg r1 manage 1501.2 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg detail_israel__wire1_adaptor.jpg r1 manage 1450.6 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg detail_russia__wire1_adaptor.jpg r1 manage 1511.7 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg detail_tax_connecotors_for_wire2-pAB_cable.jpg r1 manage 1418.6 K 2018-06-05 - 18:53 ChengguangZhu  
JPEGjpg details_sending_cable_L2L1adaptors.jpg r1 manage 1549.5 K 2018-07-03 - 18:30 ChengguangZhu  
PDFpdf fouth_adaptor_samle-S2_cable_and_pad_adaptor_connector_mounting-20180329.pdf r1 manage 350.3 K 2018-03-29 - 03:57 ChengguangZhu  
PDFpdf invoiceRussiaGasOutlet.pdf r1 manage 1509.2 K 2020-07-07 - 11:15 ChengguangZhu  
JPEGjpeg invoiceTransportation20200417.jpeg r1 manage 100.0 K 2020-05-07 - 16:29 ChengguangZhu  
JPEGjpg invoice_canada_L2_FR4_parts.jpg r1 manage 1656.3 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg invoice_canada_wire1_adaptor.jpg r1 manage 1678.2 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg invoice_chile__wire1_adaptor.jpg r1 manage 1624.3 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg invoice_israel__wire1_adaptor.jpg r1 manage 1625.1 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg invoice_russia__wire1_adaptor.jpg r1 manage 1633.1 K 2018-05-23 - 04:49 ChengguangZhu  
JPEGjpg invoice_sending_cable_L2L1adaptors.jpg r1 manage 1570.8 K 2018-07-03 - 18:31 ChengguangZhu  
JPEGjpg invoice_tax_connecotors_for_wire2-pAB_cable.jpg r1 manage 1732.8 K 2018-06-05 - 18:53 ChengguangZhu  
JPEGjpg pad_Adaptor_to_Israel.jpg r1 manage 1650.4 K 2018-03-07 - 17:34 ChengguangZhu  
PDFpdf pad_Adaptor_to_Israel_insurance.pdf r1 manage 1526.5 K 2018-03-07 - 17:34 ChengguangZhu  
PDFpdf remade_S3_FR4_parts_to_canada_insurance.pdf r1 manage 1281.9 K 2018-03-07 - 17:34 ChengguangZhu  
JPEGjpg send-padAB-stripAB-to-Canada-detail.jpg r1 manage 1621.7 K 2018-04-23 - 06:07 ChengguangZhu  
JPEGjpg send-padAB-stripAB-to-Chile-detail.jpg r1 manage 1621.8 K 2018-04-23 - 06:07 ChengguangZhu  
JPEGjpg send-padAB-stripAB-to-Chile-invoice.jpg r1 manage 1422.6 K 2018-04-23 - 06:07 ChengguangZhu  
JPEGjpg send-padAB-stripAB-to-Israel-detail.jpg r1 manage 1.0 K 2018-04-23 - 06:07 ChengguangZhu  
JPEGjpg send-padAB-stripAB-to-Israel-invoice.jpg r1 manage 1377.4 K 2018-04-23 - 06:07 ChengguangZhu  
JPEGjpg send-padAB-stripAB-to-canada-invoice.jpg r1 manage 1437.8 K 2018-04-23 - 06:07 ChengguangZhu  
JPEGjpeg transportDetail.jpeg r1 manage 118.2 K 2020-01-29 - 17:24 ChengguangZhu  
JPEGjpeg transportInvoice.jpeg r1 manage 124.9 K 2020-01-29 - 17:24 ChengguangZhu  
JPEGjpeg transportationDetails.jpeg r1 manage 109.8 K 2019-10-26 - 03:45 ChengguangZhu  
JPEGjpeg transportationInvoice.jpeg r1 manage 136.4 K 2019-10-26 - 03:45 ChengguangZhu  
PDFpdf wire0-wire1-contract-1.pdf r1 manage 261.3 K 2018-04-16 - 10:12 ChengguangZhu  
PDFpdf wire1-contract-2.pdf r1 manage 265.9 K 2018-04-16 - 10:12 ChengguangZhu  
PDFpdf wire1-diodes_capacitors_packing.pdf r1 manage 529.0 K 2018-04-16 - 10:12 ChengguangZhu  
JPEGjpg wire1_prototypes_to_canada.jpg r1 manage 1648.5 K 2018-03-07 - 17:34 ChengguangZhu  
Edit | Attach | Watch | Print version | History: r22 < r21 < r20 < r19 < r18 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r22 - 2021-01-29 - ChengguangZhu
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback