Procedures for Tracker Power ON/OFF

Power On Procedure:

  • General Rule: NO TRACKER ON IF TTCS IS NOT RUNNING
  • In the current DAQ Power Up procedure it will be asked you to switch on and make the TTCS working after the Power Step 2. Please follow instructions on how to operate the TTCS and how to monitor the Tracker temperatures before switching on the Tracker. Let a window open on AMI to check the Pump-Accumulator (Pump-SetPoint or Pt_01 Pt_02 in the AMI plots) temperature difference (has to be greater than 3 degrees) and to check the Tracker temperatures (< 30 degrees.
  • The Power Step 3 corresponds to the Tracker switch on, please confirm the execution of this step to the Run Control only after that the TTCS is up and running.
  • Data taking: calibration and taka taking runs are performed by the RunControl Procedures (WHISLIST, ....

Power Off:

  • The Run Control Power Step 7 makes the whole job.

Update Tracker LogBook:

Edit | Attach | Watch | Print version | History: r23 < r22 < r21 < r20 < r19 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r23 - 2010-08-18 - AlbertoOliva
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback