Start-up procedure (see https://twiki.cern.ch/twiki/bin/view/Main/TtcsProc):

  1. * Switch on TTCE
  2. * Set-point to +26 C and switch on the FAC heater.
  3. * Wait until the 26 C set-point is reached.
  4. * Wait 10 minutes to be sure all vapour in the loop is condensed.
    • Check Pt2, DS1, DS2, DS17 and DS18 are under 26 C.
  5. * Give Ok signal to DAQ shifters for switching ON tracker (Power Step 3).
  6. * Wait for 2-3 minutes
  7. * Check sub-cooling * Pt1 > Pt2 + 3 C
  8. * Switch on pump to 7500 rpm.

-- PierreSaouter - 15-Aug-2010

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2010-08-15 - PierreSaouter
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Main All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2019 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback