Date | Title | Agenda | Minutes | Link to presentation(s) |
---|---|---|---|---|
23.09.2019 | Ad-Hoc Meeting 5: Alignment BT-BTM-BTP | (Agenda)![]() |
(Minutes)![]() |
|
21.08.2019 | Ad-Hoc Meeting 4: EN-CV Specs for Temporary Solution for PSB Tests | (Agenda)![]() |
(Minutes)![]() |
EN-CV Specifications for Temporary Solution for PSB Tests![]() |
24.06.2019 | Ad-Hoc Meeting 3: BI/BT Line Drawings/Marking/Drilling | (Agenda)![]() |
(Minutes)![]() |
BI Line Verification![]() BI Transfer Line Checks ![]() |
03.06.2019 | Ad-Hoc Meeting 2: BI/BT Line Drawings/Marking/Drilling | (Agenda)![]() |
(Minutes)![]() |
Status BI/BT Line Drawings/Marking/Drilling![]() |
29.05.2019 | Ad-Hoc Meeting 1: EN-CV LS2 Activities on Critical Path | (Agenda)![]() |
(Minutes)![]() |
EN-CV: Brief Status and Issues![]() |
28.05.2019 | LIU-PSB TCM 3 | (Agenda)![]() |
(Minutes)![]() |
PSB LS2 Shutdown Activities: Brief Status and Issues![]() IST Preparation ![]() |
19.02.2019 | LIU-PSB TCM 2 | (Agenda)![]() |
(Minutes)![]() |
Injection Area 1L1![]() |
05.02.2019 | LIU-PSB TCM 1 | (Agenda)![]() |
(Minutes)![]() |
Project re-organisation![]() PSB LS2 Activities ![]() |
Date | Title | Agenda | Minutes | Link to presentation(s) |
---|---|---|---|---|
04.12.2018 | PS Booster Upgrade Working Group Meeting 226 | (Agenda)![]() |
(Minutes) | Linac4-to-PSB LS2 schedule![]() Update on the ECRs ![]() |
06.11.2018 | PS Booster Upgrade Working Group Meeting 225 | (Agenda)![]() |
(Minutes) | WPA and PSB master schedule![]() Update on the ECRs ![]() |
23.10.2018 | PS Booster Upgrade Working Group Meeting 224 | (Agenda)![]() |
(Minutes) | Commissioning of the new PSB wire scanner![]() EVM report ![]() |
09.10.2018 | PS Booster Upgrade Working Group Meeting 223 | (Agenda)![]() |
(Minutes) | Transmission measurement of all the PSB machine![]() |
25.09.2018 | PS Booster Upgrade Working Group Meeting 222 | (Agenda)![]() |
(Minutes) | TE-VSC activities and status![]() Status of the ECRs ![]() |
11.09.2018 | PS Booster Upgrade Working Group Meeting 221 | (Agenda)![]() |
(Minutes) | Status of the electrical and pressure conformity files![]() TE-MSC activities and status ![]() LIU-PSB EVM status ![]() |
28.08.2018 | PS Booster Upgrade Working Group Meeting 220 | (Agenda)![]() |
(Minutes) | Status of the LIU-PSB Safety File and next steps![]() EN-CV activities and status ![]() PSB and Linac 4 Applications Development during LS2 ![]() |
31.07.2018 | PS Booster Upgrade Working Group Meeting 219 | (Agenda)![]() |
(Minutes) | EN-EL activities and status and post mortem analysis during YETS![]() Signal and DC cabling and de-cabling activities ![]() Status of the ECRs and integration studies ![]() |
17.07.2018 | PS Booster Upgrade Working Group Meeting 218 | (Agenda)![]() |
(Minutes) | EN-CV Activities in B245![]() Report on the ECRs for LS2 ![]() |
03.07.2018 | PS Booster Upgrade Working Group Meeting 217 | (Agenda)![]() |
(Minutes) | Update on the POPs-B![]() |
19.06.2018 | PS Booster Upgrade Working Group Meeting 216 | (Agenda)![]() |
(Minutes) | WP analysis for LS2![]() Report on the ECRs for LS2 ![]() |
22.05.2018 | PS Booster Upgrade Working Group Meeting 215 | (Agenda)![]() |
(Minutes) | Status of H0/H- Electronics, SEM Grids in LBE and PSB WS Prototype![]() Report on the ECRs for LS2 ![]() |
08.05.2018 | PS Booster Upgrade Working Group Meeting 214 | (Agenda)![]() |
(Minutes) | EVM PSB Update![]() Report on the ECRs for LS2 ![]() |
17.04.2018 | PS Booster Upgrade Working Group Meeting 213 | (Agenda)![]() |
(Minutes) | LN-to-PSB connection project![]() Report on the ECRs for LS2 ![]() PSB Transmission Line Measurements ![]() |
03.04.2018 | PS Booster Upgrade Working Group Meeting 212 | (Agenda)![]() |
(Minutes) | Q-strip specifications with respect to beam dynamics![]() LIU PSB Q-strip power converters ![]() |
20.03.2018 | PS Booster Upgrade Working Group Meeting 211 | (Agenda)![]() |
(Minutes) | POPs-B power converter report![]() Update on the design of the BTP stopper ![]() Report on the ECRs for LS2 ![]() |
06.03.2018 | PS Booster Upgrade Working Group Meeting 210 | (Agenda)![]() |
(Minutes) | Report on the LS2 schedule![]() Transformers: intervention scenarios and spare policy ![]() Final LS2 readiness document ![]() Report on the ECRs for LS2 ![]() |
20.02.2018 | PS Booster Upgrade Working Group Meeting 209 | (Agenda)![]() |
(Minutes) | LIU-PSB MDS and studies: 2018![]() Follow-up on the Installation Readiness for LS2 ![]() Follow-up on the ECR for LS2 ![]() EVM PSB Update ![]() |
06.02.2018 | PS Booster Upgrade Working Group Meeting 208 | (Agenda)![]() |
(Minutes) | POPS-B project follow-up![]() PSB Heating system removal YETS pilot project & LS2 ![]() |
16.01.2018 | PS Booster Upgrade Working Group Meeting 207 | (Agenda)![]() |
(Minutes) | Thermomechanical simulations on the PSB scraper![]() Preliminary design of the BTP line ![]() LIU-PSB EVM Update ![]() |
05.12.2017 | PS Booster Upgrade Working Group Meeting 206 | (Agenda)![]() |
(Minutes) | Update on B-train measurements![]() Proposal of vacuum chambers for BHZ151 and associated magnets ![]() |
21.11.2017 | PS Booster Upgrade Working Group Meeting 205 | (Agenda)![]() |
(Minutes) | Update on the heating system removal intervention in the PSB tunnel![]() Building 245 – État général des travaux génie civil ![]() LIU-PSB EVM Status ![]() |
07.11.2017 | PS Booster Upgrade Working Group Meeting 204 | (Agenda)![]() |
(Minutes) | PS Complex Layout Database Refurbishment and Post-LS2 Version![]() Injector Optics Repository - Status Update ![]() |
24.10.2017 | PS Booster Upgrade Working Group Meeting 203 | (Agenda)![]() |
(Minutes) | TFB Update![]() LIU-PSB EVM Update ![]() |
10.10.2017 | PS Booster Upgrade Working Group Meeting 202 | (Agenda)![]() |
(Minutes) | Cabling for YETS 17-18 in PSB![]() New BPM in the BI line ![]() ECR for the coming YETS and LS2 ![]() |
26.09.2017 | PS Booster Upgrade Working Group Meeting 201 | (Agenda)![]() |
(Minutes) | Current Status of the PSB Scraper Study![]() LIU-PSB EVM Update ![]() Injection Q-strips ![]() |
12.09.2017 | PS Booster Upgrade Working Group Meeting 200 | (Agenda)![]() |
(Minutes) | Update on the BPM in the BI line request![]() |
29.08.2017 | PS Booster Upgrade Working Group Meeting 199 | (Agenda)![]() |
(Minutes) | Report on the Installation of the New Wirescanner during TS3![]() LIU-PSB EVM Update ![]() Follow-up on the Installation Readiness for LS2 ![]() Additional BPMs in the PSB Transfer Lines ![]() |
01.08.2017 | PS Booster Upgrade Working Group Meeting 198 | (Agenda)![]() |
(Minutes) | Update on the PSB Cooling and Ventilation Systems![]() |
18.07.2017 | PS Booster Upgrade Working Group Meeting 197 | (Agenda)![]() |
(Minutes) | Update on the PSB Transfer Lines![]() |
04.07.2017 | PS Booster Upgrade Working Group Meeting 196 | (Agenda)![]() |
(Minutes) | Follow-up on the B-train![]() |
20.06.2017 | PS Booster Upgrade Working Group Meeting 195 | (Agenda)![]() |
(Minutes) | Status of SEM Grids for Injection Matching![]() LIU-PSB EVM ![]() |
06.06.2017 | PS Booster Upgrade Working Group Meeting 194 | (Agenda)![]() |
(Minutes) | RF bypass measurements in PS with high intensity beams![]() |
23.05.2017 | PS Booster Upgrade Working Group Meeting 193 | (Agenda)![]() |
(Minutes) | Follow up of the new PSB injection from the HST![]() B245 Modifications and Cabling Update ![]() |
09.05.2017 | PS Booster Upgrade Working Group Meeting 192 | (Agenda)![]() |
(Minutes) | RF bypass impedence measurements![]() Update on the recombination kickers ![]() Linac4 connection ![]() LIU-PSB EVM ![]() ECR status for Linac4 connection ![]() |
25.04.2017 | PS Booster Upgrade Working Group Meeting 191 | (Agenda)![]() |
(Minutes) | BLMs installation status![]() |
11.04.2017 | PS Booster Upgrade Working Group Meeting 190 | (Agenda)![]() |
(Minutes) | BT, BTM and BTP integration![]() Cancel MPS ripples with BDLs ![]() |
28.03.2017 | PS Booster Upgrade Working Group Meeting 189 | (Agenda)![]() |
(Minutes) | Booster MDs![]() LIU-PSB EVM Status ![]() |
14.03.2017 | PS Booster Upgrade Working Group Meeting 188 | (Agenda)![]() |
(Minutes) | Thermo-structural analysis on a UHV gate valve![]() |
28.02.2017 | PS Booster Upgrade Working Group Meeting 187 | (Agenda)![]() |
(Minutes) | BRF2-bunker PSB![]() |
21.02.2017 | PS Booster/PS Upgrade Working Group Meeting 3 | (Agenda)![]() |
(Minutes) | The PSB, PS and TL Optics Repositories![]() |
07.02.2017 | PS Booster Upgrade Working Group Meeting 186 | (Agenda)![]() |
(Minutes) | Feedback from POPS Explosion Analysis![]() De-cabling & cabling during EYETS 16-17 in the Booster ![]() |
17.01.2017 | PS Booster Upgrade Working Group Meeting 185 | (Agenda)![]() |
(Minutes) | Recombination Kicker Rise Time![]() Recombination Kicker Waveform Measurements ![]() |
06.12.2016 | PS Booster Upgrade Working Group Meeting 184 | (Agenda)![]() |
(Minutes) | LIU-PSB Beam Dynamic Studies![]() |
22.11.2016 | PS Booster Upgrade Working Group Meeting 183 | (Agenda)![]() |
(Minutes) | TE/VSC Simulation of the New Beam Scraper/Absorber![]() Thermo-structural Analysis on a UHV Gate Valve Hit by LIU-PSB Beam ![]() Proposed Magnetic Cycle at 1.4 and 2 GeV ![]() |
08.11.2016 | PS Booster Upgrade Working Group Meeting 182 | (Agenda)![]() |
(Minutes) | Review of BI Equipment for the Linac4-to-PSB Connection![]() |
01.11.2016 | PS Booster/PS Upgrade Working Group Meeting 2 | (Agenda)![]() |
(Minutes) | PSB RF Bypasses![]() PS RF Bypasses ![]() Plans for the New PSB B-Train during EYETS and BT.BHZ10 BTrain Option ![]() Status of the LLRF for the New PS B-Train System ![]() |
04.10.2016 | PS Booster Upgrade Working Group Meeting 181 | (Agenda)![]() |
(Minutes) | Status/Preparation of the Control Applications for L4-to-PSB Connection![]() Synchronization between Linac4 and PSB ![]() |
20.09.2016 | PS Booster Upgrade Working Group Meeting 180 | (Agenda)![]() |
(Minutes) | PSB Injection Mock-up Area/Stripping Foil Test Stand![]() |
06.09.2016 | PS Booster Upgrade Working Group Meeting 179 | (Agenda)![]() |
(Minutes) | Material Choice for the Vacuum Window at the Exit of BTM![]() EN-STI Activities in the Framework of LIU-PSB ![]() |
16.08.2016 | PS Booster Upgrade Working Group Meeting 178 | (Agenda)![]() |
(Minutes) | HST Hardware Installation and Commissioning![]() |
19.07.2016 | PS Booster Upgrade Working Group Meeting 177 | (Agenda)![]() |
(Minutes) | Recombination Kicker Rise Time![]() Recombination Kicker Waveform Measurements ![]() |
05.07.2016 | PS Booster Upgrade Working Group Meeting 176 | (Agenda)![]() |
(Minutes) | Cabling Commitment for LIU-PSB during EYETS![]() PSB Beam Scrapers/Absorbers: Thermo-Mechanical Simulations ![]() |
07.06.2016 | PS Booster Upgrade Working Group Meeting 175 | (Agenda)![]() |
(Minutes) | LS2 Master Schedule![]() POPS-B Project Update and Feedback from POPS Experience ![]() TFB Amplifier Prototype ![]() |
24.05.2016 | PS Booster Upgrade Working Group Meeting 174 | (Agenda)![]() |
(Minutes) | Status of the Safety Files![]() Forecasts for Waste and Radioactive Material Storage ![]() |
10.05.2016 | PS Booster Upgrade Working Group Meeting 173 | (Agenda)![]() |
(Minutes) | |
03.05.2016 | PS Booster/PS Upgrade Working Group Meeting 1 | (Agenda)![]() |
(Minutes) | Complementary Measurements on the Main Dipole for the Booster B-Train System![]() B-Train System ![]() |
19.04.2016 | PS Booster Upgrade Working Group Meeting 172 | (Agenda)![]() |
(Minutes) | ECR/SSR for EYETS 2016/2017![]() PSB Beam Absorber/Scraper After LS2 ![]() PSB Beam Absorber/Scraper After LS2 ![]() |
05.04.2016 | PS Booster Upgrade Working Group Meeting 171 | (Agenda)![]() |
(Minutes) | PSB RF System Upgrade Availability Studies![]() Field Control of TL Switching Dipole ![]() |
22.03.2016 | PS Booster Upgrade Working Group Meeting 170 | (Agenda)![]() |
(Minutes) | MD Planning in 2016 for LIU-PSB![]() EPC Planned Work for EYETS 2016 ![]() PSB-PS Magnets Specifications ![]() |
08.03.2016 | PS Booster Upgrade Working Group Meeting 169 | (Agenda)![]() |
(Minutes) | Alignment Changes in the PSB after YETS 2015/2016![]() Review of the Present Issues in the Alignment the PSB Equipment, T. Dobers Longitudinal Dynamic Simulations of PSB Beams in the LINAC4 Scenario ![]() |
23.02.2016 | PS Booster Upgrade Working Group Meeting 168 | (Agenda)![]() |
(Minutes) | Handling of Magnets BT.BHZ10 and BTM.BHZ10![]() Removal of CV Pipes in the PSB Injection Region ![]() |
09.02.2016 | PS Booster Upgrade Working Group Meeting 167 | (Agenda)![]() |
(Minutes) | Status of the PSB Transverse Feedback![]() |
19.01.2016 | PS Booster Upgrade Working Group Meeting 166 | (Agenda)![]() |
(Minutes) | Recombination Kicker Rise Time![]() Review of the Optics of the PSB Extraction Lines ![]() Quadrupoles Trims for 2 GeV Operation/Tunes at Extraction ![]() |
10.12.2015 | PS Booster Upgrade Working Group Meeting 165 | (Agenda)![]() |
(Minutes) | Finement Project Review and Planning![]() |
26.11.2015 | PS Booster Upgrade Working Group Meeting 164 | (Agenda)![]() |
(Minutes) | Status of the PSB Extraction and Recombination Septa and Kickers![]() |
12.11.2015 | PS Booster Upgrade Working Group Meeting 163 | (Agenda)![]() |
(Minutes) | Injection Tests with Carbon Foils in ISIS![]() |
05.11.2015 | PS Booster Upgrade Working Group Meeting 162 | (Agenda)![]() |
(Minutes) | Magnetic Measurement on PSB Dipoles Main and Injection Type![]() PSB BHZ Main Magnets and the Required Trims ![]() Status of PSB B-train System Upgrade ![]() |
22.10.2015 | PS Booster Upgrade Working Group Meeting 161 | (Agenda)![]() |
(Minutes) | Discussion about Review of the Present Issues in Alignment the PSB Equipment , T. Dobers Integration Issues of the BT-BTM-BTP Line ![]() Optics Changes Needed to Address the Integration Issues of the BT-BTM-BTP Line ![]() |
08.10.2015 | PS Booster Upgrade Working Group Meeting 160 | (Agenda)![]() |
(Minutes) | Pumping in Sections 4L1 and 11L1 for the Installation of the New Wire Scanners![]() Exchange Procedure for the Stripping Foil ![]() Status of the Test Stand of the Stripping Foil ![]() |
24.09.2015 | PS Booster Upgrade Working Group Meeting 159 | (Agenda)![]() |
(Minutes) | Review of the Optics of the PSB Extraction Lines![]() Stability Studies of the PSB-PS Extraction Line ![]() |
17.09.2015 | PS Booster Upgrade Working Group Meeting 158 | (Agenda)![]() |
(Minutes) | Requests to EN/EL for the LIU-PSB![]() Status of the Ongoing Activities in B245 ![]() Status Report about Installation, Transport and Handling ![]() |
03.09.2015 | PS Booster Upgrade Working Group Meeting 157 | (Agenda)![]() |
(Minutes) | Requests to EN/EL for the LIU-PSB![]() Rack Layout for the Finemet Cavities ![]() Planning of the LIU-PSB Activities (YETS/EYETS/LS2) ![]() |
27.08.2015 | PS Booster Upgrade Working Group Meeting 156 | (Agenda)![]() |
(Minutes) | Requests to EN/EL for the LIU-PSB![]() Discussion about the ECR PSB-LJ-EC-0001 ![]() Results from the LV Measurement Campaign ![]() |
06.08.2015 | PS Booster Upgrade Working Group Meeting 155 | (Agenda)![]() |
(Minutes) | Follow-up of the Shielding Simulation for the HST![]() |
16.07.2015 | PS Booster Upgrade Working Group Meeting 154 | (Agenda)![]() |
(Minutes) | Requests to EN/EL for the LIU-PSB![]() Discussion about Review of the Present Issues in Alignment the PSB Equipment , T. Dobers. |
02.07.2015 | PS Booster Upgrade Working Group Meeting 153 | (Agenda)![]() |
(Minutes) | Requests to EN/EL for the LIU-PSB![]() Status of the Beam Intercepting Devices Equipment for the 2.0 GeV Upgrade ![]() Alternative Solution for the Vacuum Window at the Exit of BTM and Experience with the Beam Dump Temperature Measurements ![]() |
25.06.2015 | PS Booster Upgrade Working Group Meeting 152 | (Agenda)![]() |
(Minutes) | Warm Magnet Interlock System![]() Requests to EN/EL for the LIU-PSB ![]() |
18.06.2015 | PS Booster Upgrade Working Group Meeting 151 | (Agenda)![]() |
(Minutes) | BRF2 Integration Model Status![]() Requests to EN/EL for the LIU-PSB ![]() Organization for LIU: Power Distribution ![]() Shielding Simulation for the HST ![]() |
04.06.2015 | PS Booster Upgrade Working Group Meeting 150 | (Agenda)![]() |
(Minutes) | Safety Packages Proposal![]() B245 Construction Status ![]() Requests to EN/EL for the LIU-PSB ![]() PSB Finemet Cavities LS2 Rack Space Request ![]() End-2016 Readiness for the Beam Interlock System ![]() End-2016 Readiness for the RF Bypasses and TFB Electronics ![]() End-2016 Readiness for Controls ![]() End-2016 Readiness for Applications ![]() |
21.05.2015 | PS Booster Upgrade Working Group Meeting 149 | (Agenda)![]() |
(Minutes) | Progress on LIU-PSB Upgrade Work Activities![]() Collect Needs for Cooling And Ventilation ![]() Requests to EN/EL for the LIU-PSB ![]() Status of Readiness for End-2016 Deadline for L4 Connection for WP 9.2 ![]() Status of Readiness for End-2016 Deadline for L4 Connection ![]() |
07.05.2015 | PS Booster Upgrade Working Group Meeting 148 | (Agenda)![]() |
(Minutes) | Collect Needs for Cooling And Ventilation![]() Racks Space Allocation Layout of BRF2/BAT ![]() |
30.04.2015 | PS Booster Upgrade Working Group Meeting 147 | (Agenda)![]() |
(Minutes) | LIU-PSB Templates![]() Requests to EN/EL for the LIU-PSB ![]() |
16.04.2015 | PS Booster Upgrade Working Group Meeting 146 | (Agenda)![]() |
(Minutes) | List of BI Open Actions![]() Activities YETS15-16 ![]() ![]() Collect Needs for Cooling And Ventilation ![]() Collect Needs for Cabling ![]() Qstrips Power Converters Specifications ![]() |
26.03.2015 | PS Booster Upgrade Working Group Meeting 145 | (Agenda)![]() |
(Minutes) | Items Needed for L4 Connection![]() LIU BI.DIS Rise Time ![]() Measurement of the Current KFA Rise Time ![]() EN-MEF-SU Open Actions ![]() |
12.03.2015 | PS Booster Upgrade Working Group Meeting 144 | (Agenda)![]() |
(Minutes) | POPS-B![]() |
26.02.2015 | PS Booster Upgrade Working Group Meeting 143 | (Agenda)![]() |
(Minutes) | Review of the readiness for the end-2016 deadline for the equipment for Linac4 connection. |
12.02.2015 | PS Booster Upgrade Working Group Meeting 142 | (Agenda)![]() |
(Minutes) | End-2016 Readiness for the Equipment for Linac4![]() POPS-B ![]() Status of the Half Sector Test ![]() |
29.01.2015 | PS Booster Upgrade Working Group Meeting 141 | (Agenda)![]() |
(Minutes) | Review of the BI Equipment Installed for the LIU-PSB Upgrade![]() |
15.01.2015 | PS Booster Upgrade Working Group Meeting 140 | (Agenda)![]() |
(Minutes) | MADX and Aperture Studies for the BI Transfer Line![]() |
04.12.2014 | PS Booster Upgrade Working Group Meeting 139 | (Agenda)![]() |
(Minutes) | Handling System for the PSB Reference Magnet in B361![]() Impact of Placing the PSB Reference Magnet in B245 ![]() |
27.11.2014 | PS Booster Upgrade Working Group Meeting 138 | (Agenda)![]() |
(Minutes) | Status Report on the Integration of the PSB-PS Transfer Lines![]() |
13.11.2014 | PS Booster Upgrade Working Group Meeting 137 | (Agenda)![]() |
(Minutes) | Functional Specifications Review for the Stripping Foil BSW Magnets Power Converters![]() |
06.11.2014 | PS Booster Upgrade Working Group Meeting 136 | (Agenda)![]() |
(Minutes) | Aperture Study on the PSB Extraction and Recombination Lines![]() LIU-PSB Updated Budget Profiles ![]() |
30.10.2014 | PS Booster Upgrade Working Group Meeting 135 | (Agenda)![]() |
(Minutes) | H- Injection into the ISIS Synchrotron![]() ![]() ![]() |
16.10.2014 | PS Booster Upgrade Working Group Meeting 134 | (Agenda)![]() |
(Minutes) | PSB Reference Magnet![]() ![]() |
09.10.2014 | PS Booster Upgrade Working Group Meeting 133 | (Agenda)![]() |
(Minutes) | LIU-PSB Budget Review![]() LIU-PSB Configuration Management ![]() |
25.09.2014 | PS Booster Upgrade Working Group Meeting 132 | (Agenda)![]() |
(Minutes) | Building 245 - Civil engineering budget![]() ![]() |
04.09.2014 | PS Booster Upgrade Working Group Meeting 131 | (Agenda)![]() |
(Minutes) | BLMs integration in PSB H- injection system![]() |
21.08.2014 | PS Booster Upgrade Working Group Meeting 130 | (Agenda)![]() |
(Minutes) | LIU-PSB Work Breakdown Structure![]() |
24.07.2014 | PS Booster Upgrade Working Group Meeting 129 | (Agenda)![]() |
(Minutes) | Aperture Checks for Different Linac4 Transfer Line Optics![]() |
10.07.2014 | PS Booster Upgrade Working Group Meeting 128 | (Agenda)![]() |
(Minutes) | |
26.06.2014 | PS Booster Upgrade Working Group Meeting 127 | (Agenda)![]() |
(Minutes) | Handling of Critical Items for Transportation![]() |
12.06.2014 | PS Booster Upgrade Working Group Meeting 126 | (Agenda)![]() |
(Minutes) | Localisation of Beam Losses in PSB![]() ![]() |
22.05.2014 | PS Booster Upgrade Working Group Meeting 125 | (Agenda)![]() |
(Minutes) | Updated Status of the Impedance Model for the PSB![]() |
08.05.2014 | PS Booster Upgrade Working Group Meeting 124 | (Agenda)![]() |
(Minutes) | New Optics of the PSB measurement line (BTM)![]() |
24.04.2014 | PS Booster Upgrade Working Group Meeting 123 | (Agenda)![]() |
(Minutes) | MDs Planning for 2014![]() |
10.04.2014 | PS Booster Upgrade Working Group Meeting 122 | (Agenda)![]() |
(Minutes) | |
27.03.2014 | PS Booster Upgrade Working Group Meeting 121 | (Agenda)![]() |
(Minutes) | New Cooling strategy for the B245![]() |
13.02.2014 | PS Booster Upgrade Working Group Meeting 120 | (Agenda)![]() |
(Minutes) | Optics Measurements in the PSB![]() |
30.01.2014 | PS Booster Upgrade Working Group Meeting 119 | (Agenda)![]() |
(Minutes) | Building 245 project update![]() |
23.01.2014 | PS Booster Upgrade Working Group Meeting 118 | (Agenda)![]() |
(Minutes) | W. Weterings, New baseline design for the H0/H- beam dump![]() |
16.01.2014 | PS Booster Upgrade Working Group Meeting 117 | (Agenda)![]() |
(Minutes) | |
12.12.2013 | PS Booster Upgrade Working Group Meeting 116 | (Agenda)![]() |
(Minutes) | |
05.12.2013 | PS Booster Upgrade Working Group Meeting 115 | (Agenda)![]() |
(Minutes) | D. Hay, PSB Cranes renovation/replacement![]() |
07.11.2013 | PS Booster Upgrade Working Group Meeting 114 | (Agenda)![]() |
(Minutes) | Bulding 245 schedule update![]() |
24.10.2013 | PS Booster Upgrade Working Group Meeting 113 | (Agenda)![]() |
(Minutes) | Status of the RF![]() |
10.10.2013 | Review of the PSB Ejection Lines @2GeV![]() |
(Agenda)![]() |
(Minutes) | Optics of the Ejection Lines @2GeV![]() ![]() |
09.10.2013 | PSB injection sectorisation vs dump design | (Minutes) | ||
26.09.2013 | PS Booster Upgrade Working Group Meeting 112 | (Agenda)![]() |
(Minutes) | Beam dynamic: Inconel vacuum chamber![]() |
19.09.2013 | PS Booster Upgrade Working Group Meeting 111 | (Agenda)![]() |
(Minutes) | PSB H- Injection Vacuum Sectorisation![]() |
12.09.2013 | PS Booster Upgrade Working Group Meeting 110 | (Agenda)![]() |
(Minutes) | |
22.08.2013 | PS Booster Upgrade Working Group Meeting 109 | (Agenda)![]() |
(Minutes) | PSB Realignment Campaign![]() |
15.08.2013 | PS Booster Upgrade Working Group Meeting 108 | (Agenda)![]() |
(Minutes) | BLM cabling non-conformities![]() |
08.08.2013 | PS Booster Upgrade Working Group Meeting 107 | (Agenda)![]() |
(Minutes) | Configuration Management & ECRs![]() |
04.07.2013 | PS Booster Upgrade Working Group Meeting 106 | (Agenda)![]() |
(Minutes) | Report on ALARA committee and Status of New Main Dump![]() |
27.06.2013 | PS Booster Upgrade Working Group Meeting 105 | (Agenda)![]() |
(Minutes) | BTM Optics sutdies![]() ![]() |
13.06.2013 | PS Booster Upgrade Working Group Meeting 104 | (Agenda)![]() |
(Minutes) | Rack space in 361![]() ![]() |
30.05.2013 | PS Booster Upgrade Working Group Meeting 103 | (Agenda)![]() |
(Minutes) | Inconel vacuum chamber for injection section, Multipolar Effects![]() ![]() ![]() |
16.05.2013 | PS Booster Upgrade Working Group Meeting 102 | (Agenda)![]() |
(Minutes) | Design of BI.DHZ.DVT50/BI.DHZ.DVT70![]() |
25.04.2013 | PS Booster Upgrade Working Group Meeting 101 | (Agenda)![]() |
(Minutes) | PSB with Linac 4 - RF matching![]() |
18.04.2013 | Review on the H-/H0 dumps | (Agenda)![]() |
(Minutes) | H0/H- dumps![]() ![]() ![]() ![]() |
11.04.2013 | PS Booster Upgrade Working Group Meeting 100 | (Agenda)![]() |
(Minutes) | Status of the New PSB Main Dump; Dismantling of the Old PSB Dump |
14.03.2013 | PS Booster Upgrade Working Group Meeting 99 | (Agenda)![]() |
(Minutes) | Injection Aperture Limitations![]() |
07.03.2013 | PS Booster Upgrade Working Group Meeting 98 | (Agenda)![]() |
(Minutes) | LLRF : PSB ring inhibit in the Linac4 area![]() |
28.02.2013 | PS Booster Upgrade Working Group Meeting 97 | (Agenda)![]() |
(Minutes) | Beam Interlock System for transfer line and PSB![]() |
14.02.2013 | PS Booster Upgrade Working Group Meeting 96 | (Agenda)![]() |
(Minutes) | Design of Booster Injection Quadrupole magnets![]() |
07.02.2013 | PS Booster Upgrade Working Group Meeting 95 | (Agenda)![]() |
(Minutes) | Optic Transfer Line L4 to PSB![]() |
31.01.2013 | PS Booster Upgrade Working Group Meeting 94 | (Agenda)![]() |
(Minutes) | |
17.01.2013 | PS Booster Upgrade Working Group Meeting 93 | (Agenda)![]() |
(Minutes) | |
13.12.2012 | PS Booster Upgrade Working Group Meeting 92 | (Agenda)![]() |
(Minutes) | |
29.11.2012 | PS Booster Upgrade Working Group Meeting 91 | (Agenda)![]() |
(Minutes) | Head/Tails and H-/H0 dumps dedicated meeting |
22.11.2012 | PS Booster Upgrade Working Group Meeting 90 | (Agenda)![]() |
(Minutes) | PSB Dump Replacement - Strategy and Status![]() |
08.11.2012 | PS Booster Upgrade Working Group Meeting 89 | (Agenda)![]() |
(Minutes) | SMIT vs. TRIUMF magnets for Booster Inj. Line![]() |
25.10.2012 | PS Booster Upgrade Working Group Meeting 88 | (Agenda)![]() |
(Minutes) | |
11.10.2012 | PS Booster Upgrade Working Group Meeting 87 | (Agenda)![]() |
(Minutes) | Timeline H- Injection![]() |
04.10.2012 | PS Booster Upgrade Working Group Meeting 86 | (Agenda)![]() |
(Minutes) | |
20.09.2012 | PS Booster Upgrade Working Group Meeting 85 | (Agenda)![]() |
(Minutes) | Follow-up of the PSB dump review |
13.09.2012 | PS Booster Upgrade Working Group Meeting 84 | (Agenda)![]() |
(Minutes) | MPS planning![]() |
30.08.2012 | PS Booster Upgrade Working Group Meeting 83 | (Agenda)![]() |
(Minutes) | Review of the PSB Dump |
16.08.2012 | PS Booster Upgrade Working Group Meeting 82 | (Agenda)![]() |
(Minutes) | |
26.07.2012 | PS Booster Upgrade Working Group Meeting 81 | (Agenda)![]() |
(Minutes) | BTV prototype at the stripping foil, A. Ravni |
19.07.2012 | PS Booster Upgrade Working Group Meeting 80 | (Agenda)![]() |
(Minutes) | Integration of the Injection Region![]() |
05.07.2012 | PS Booster Upgrade Working Group Meeting 79 | (Agenda)![]() |
(Minutes) | MPS for PSB - preliminary design and planning |
21.06.2012 | PS Booster Upgrade Working Group Meeting 78 | (Agenda)![]() |
(Minutes) | Review on shorter PSB main dipole magnets |
14.06.2012 | PS Booster Upgrade Working Group Meeting 77 | (Agenda)![]() |
(Minutes) | PSB dump cooling (RP recommendations![]() ![]() ![]() ![]() |
31.05.2012 | PS Booster Upgrade Working Group Meeting 76 | (Agenda)![]() |
(Minutes) | LS1 work and cabling requests |
24.05.2012 | PS Booster Upgrade Working Group Meeting 75 | (Agenda)![]() |
(Minutes) | |
10.05.2012 | PS Booster Upgrade Working Group Meeting 74 | (Agenda)![]() |
(Minutes) | OP priority list for BI![]() |
03.05.2012 | PS Booster Upgrade Working Group Meeting 73 | (Agenda)![]() |
(Minutes) | BT.BHZ10 Upgrade, W. Bartmann, A. Newborough (slides)![]() |
26.04.2012 | PS Booster Upgrade Working Group Meeting 72 | (Agenda)![]() |
(Minutes) | Internal H0/H- dump, M. Delonca (slides)![]() |
19.04.2012 | PS Booster Upgrade Working Group Meeting 71 | (Agenda)![]() |
(Minutes) | |
05.04.2012 | PS Booster Upgrade Working Group Meeting 70 | (Agenda)![]() |
(Minutes) | PSB magnetic cycle 900 ms, A. Blas(slides![]() |
29.03.2012 | PS Booster Upgrade Working Group Meeting 69 | (Agenda)![]() |
(Minutes) | Update on PSB Injection with Linac4 |
22.03.2012 | PS Booster Upgrade Working Group Meeting 68 | (Agenda)![]() |
(Minutes) | |
15.03.2012 | PS Booster Upgrade Working Group Meeting 67 | (Agenda)![]() |
(Minutes) | Update on PSB Injection with Linac4 |
01.03.2012 | PS Booster Upgrade Working Group Meeting 66 | (Agenda)![]() |
(Minutes) | Sensitivity study of BLMs to beam losses, S.Damjanovic(here![]() ![]() |
23.02.2012 | PS Booster Upgrade Working Group Meeting 65 | (Agenda)![]() |
(Minutes) | Update on PSB Injection with Linac4 |
16.02.2012 | PS Booster Upgrade Working Group Meeting 64 | (Agenda)![]() |
(Minutes) | RP-Cooling circuit for future PSB dump, R. Froeschl (here![]() |
02.02.2012 | PS Booster Upgrade Working Group Meeting 63 | (Agenda)![]() |
(Minutes) | Planning for the new PSB dump, S. Mathot (here![]() |
26.01.2012 | PS Booster Upgrade Working Group Meeting 62 | (Agenda)![]() |
(Minutes) | Update on PSB Injection with Linac4 |
19.01.2012 | PS Booster Upgrade Working Group Meeting 61 | (Agenda)![]() |
(Minutes) | Preliminary design of the dump, A. Sarrió Martinez (slides![]() |
12.01.2012 | PS Booster Upgrade Working Group Meeting 60 | (Agenda)![]() |
(Minutes) | Prioritization of cabling needs, P. Bonnal (slides![]() |
08.12.2011 | PS Booster Upgrade Working Group Meeting 59 | (Agenda)![]() |
(Minutes) | |
01.12.2011 | PS Booster Upgrade Working Group Meeting 58 | (Agenda)![]() |
(Minutes) | |
17.11.2011 | PS Booster Upgrade Working Group Meeting 57 | (Agenda)![]() |
(Minutes) | PSB dump replacement, A. Sarrió Martinez (slides![]() |
03.11.2011 | PS Booster Upgrade Working Group Meeting 56 | (Agenda)![]() |
(Minutes) | |
20.10.2011 | PS Booster Upgrade Working Group Meeting 55 | (Agenda)![]() |
(Minutes) | |
13.10.2011 | PS Booster Upgrade Working Group Meeting 54 | (Agenda)![]() |
(Minutes) | Beam sizes for the BTM dump, W. Bartmann (slides![]() |
06.10.2011 | PS Booster Upgrade Working Group Meeting 53 | (Agenda)![]() |
(Minutes) | Study to replace on BT.BHZ10 and on new optics on extraction line, W. Bartmann (slides![]() |
29.09.2011 | PS Booster Upgrade Working Group Meeting 52 | (Agenda)![]() |
(Minutes) | |
15.09.2011 | PS Booster Upgrade Working Group Meeting 51 | (Agenda)![]() |
(Minutes) | |
01.09.2011 | PS Booster Upgrade Working Group Meeting 50 | (Agenda)![]() |
(Minutes) | RF renovation planning, M. Poaluzzi (slides) |
18.08.2011 | PS Booster Upgrade Working Group Meeting 49 | (Agenda)![]() |
(Minutes) | |
11.08.2011 | PS Booster Upgrade Working Group Meeting 48 | (Agenda)![]() |
(Minutes) | |
21.07.2011 | PS Booster Upgrade Working Group Meeting 47 | (Agenda)![]() |
(Minutes) | |
30.06.2011 | PS Booster Upgrade Working Group Meeting 46 | (Agenda)![]() |
(Minutes) | |
23.06.2011 | PS Booster Upgrade Working Group Meeting 45 | (Agenda)![]() |
(Minutes) | |
16.06.2011 | PS Booster Upgrade Working Group Meeting 44 | (Agenda)![]() |
(Minutes) | |
09.06.2011 | PS Booster Upgrade Working Group Meeting 43 | (Agenda)![]() |
(Minutes) | Introduction to WBS, J. de Jonghe (slides) |
26.05.2011 | PS Booster Upgrade Working Group Meeting 42 | (Agenda)![]() |
(Minutes) | BTY @ 2GeV, D. Voulot (slides) |
19.05.2011 | PS Booster Upgrade Working Group Meeting 41 | (Agenda)![]() |
(Minutes) | |
12.05.2011 | PS Booster Upgrade Working Group Meeting 40 | (Agenda)![]() |
(Minutes) | KSW Pulse form with Linac4 injection, C. Bracco(slides); RCS Lattice Option , M. Fitterer(slides) |
05.05.2011 | PS Booster Upgrade Working Group Meeting 39 | (Agenda)![]() |
(Minutes) | |
28.04.2011 | PS Booster Upgrade Working Group Meeting 38 | (Agenda)![]() |
(Minutes) | |
21.04.2011 | PS Booster Upgrade Working Group Meeting 37 | (Agenda)![]() |
(Minutes) | RCS design choices, H. Schoenauer (slides) |
14.04.2011 | PS Booster Upgrade Working Group Meeting 36 | (Agenda)![]() |
(Minutes) | PS 2GeV Injection – Feasible?, W. Bartmann(slides) |
07.04.2011 | PS Booster Upgrade Working Group Meeting 35 | (Agenda)![]() |
(Minutes) | Update on RCS lattice design, M.Fitterer(slides); RCS Preliminary beam transfer considerations, B. Goddard(slides) |
31.03.2011 | PS Booster Upgrade Working Group Meeting 34 | (Agenda)![]() |
(Minutes) | 2 GeV protons for ISOLDE, T. Stora(slides) |
24.03.2011 | PS Booster Upgrade Working Group Meeting 33 | (Agenda)![]() |
(Minutes) | |
17.03.2011 | PS Booster Upgrade Working Group Meeting 32 | (Agenda)![]() |
(Minutes) | |
10.03.2011 | PS Booster Upgrade Working Group Meeting 31 | (Agenda)![]() |
(Minutes) | |
24.02.2011 | PS Booster Upgrade Working Group Meeting 30 | (Agenda)![]() |
(Minutes) | |
17.02.2011 | PS Booster Upgrade Working Group Meeting 29 | (Agenda)![]() |
(Minutes) | |
10.02.2011 | PS Booster Upgrade Working Group Meeting 28 | (Agenda)![]() |
(Minutes) | Advanced Connection of Linac4 to PSB, W. Weterings, J. Borburgh (slides![]() |
03.02.2011 | PS Booster Upgrade Working Group Meeting 27 | (Agenda)![]() |
(Minutes) | Upgrade of Vacuum System, E. Mahner (slides![]() |
13.01.2011 | PS Booster Upgrade Working Group Meeting 26 | (Agenda)![]() |
(Minutes) | |
09.12.2010 | L4BCC on PSB Injection | (Agenda)![]() |
(Minutes)![]() |
|
02.12.2010 | PS Booster Upgrade Working Group Meeting 25 | (Agenda)![]() |
(Minutes) | PSB Injection Modifications, W. Weterings (slides) |
01.12.2010 | Workshop of the LIU Project | (Agenda)![]() |
(Minutes)![]() |
|
18.11.2010 | PS Booster Upgrade Working Group Meeting 24 | (Agenda)![]() |
(Minutes) | Upgrade of Electrical System, S. Olek (slides) |
04.11.2010 | PS Booster Upgrade Working Group Meeting 23 | (Agenda)![]() |
(Minutes) | |
21.10.2010 | PS Booster Upgrade Working Group Meeting 22 | (Agenda)![]() |
(Minutes) | |
07.10.2010 | PS Booster Upgrade Working Group Meeting 21 | (Agenda)![]() |
(Minutes) | Alternative for Booster MPS, S. Pittet (slides![]() |
16.09.2010 | PS Booster Upgrade Working Group Meeting 20 | (Agenda)![]() |
(Minutes) | Alternative Magnetic Cycles, C. Carli (slides); Magnet Tests in SM 18, A. Newborough (slides) |
02.09.2010 | PS Booster Upgrade Working Group Meeting 19 | (Agenda)![]() |
(Minutes) | Report on MD Results and Implications on PSB Upgrade, G. Rumolo (slides) |
26.08.2010 | PS Booster Upgrade Working Group Meeting 18 | (Agenda)![]() |
(Minutes) | |
29.07.2010 | PS Booster Upgrade Working Group Meeting 17 | (Agenda)![]() |
(Minutes) | |
15.07.2010 | PS Booster Upgrade Working Group Meeting 16 | (Agenda)![]() |
(Minutes) | Damping Resistors on PSB Bending Magnets, A. Newborough (slides![]() |
01.07.2010 | PS Booster Upgrade Working Group Meeting 15 | (Agenda)![]() |
(Minutes) | |
24.06.2010 | PS Booster Upgrade Working Group Meeting 14 | (Agenda)![]() |
(Minutes) | Expected Beam Loss Figures and Cures, G. Rumolo, S. Gilardoni (slides) |
17.06.2010 | PS Booster Upgrade Working Group Meeting 13 | (Agenda)![]() |
(Minutes) | PS Low Energy Magnets, S. Gilardoni (slides) |
10.06.2010 | PS Booster Upgrade Working Group Meeting 12 | (Agenda)![]() |
(Minutes) | |
03.06.2010 | PS Booster Upgrade Working Group Meeting 11 | (Agenda)![]() |
(Minutes) | |
12.05.2010 | PS Booster Upgrade Working Group Meeting 10 | (Agenda)![]() |
(Minutes) | |
06.05.2010 | PS Booster Upgrade Working Group Meeting 9 | (Agenda)![]() |
(Minutes) | |
29.04.2010 | PS Booster Upgrade Working Group Meeting 8 | (Agenda)![]() |
(Minutes) | Magnetic Cycle from 50 MeV to 2 GeV, A. Blas (slides) |
15.04.2010 | PS Booster Upgrade Working Group Meeting 7 | (Agenda)![]() |
(Minutes) | |
08.04.2010 | PS Booster Upgrade Working Group Meeting 6 | (Agenda)![]() |
(Minutes) | |
01.04.2010 | PS Booster Upgrade Working Group Meeting 5 | (Agenda)![]() |
(Minutes) | |
25.03.2010 | PS Booster Upgrade Working Group Meeting 4 | (Agenda)![]() |
(Minutes) | |
18.03.2010 | PS Booster Upgrade Working Group Meeting 3 | (Agenda)![]() |
(Minutes) | Results on Showstopper Identification (slides![]() |
11.03.2010 | PS Booster Upgrade Working Group Meeting 2 | (Agenda)![]() |
(Minutes) | First Status Report on Show Stoppers for PSB 2 GeV Upgrade (slides![]() |
04.03.2010 | PS Booster Upgrade Working Group Meeting 1 | (Agenda)![]() |
(Minutes) |
Date | Title | Minutes |
---|---|---|
01.06.2018 | Linac4-to -PSB Injection Scheme and Linac4 Feed-Forward Algorithm | Minutes![]() |
24.05.2018 | Discussion about the KSW/BSW/Bdl/QSTRIP Synchronisation at PSB Injection | Agenda![]() ![]() |
01.09.2017 | Discussion on the Upcoming Vacuum Test for the LS2 Head and Tail Dumps | (Minutes) |
08.06.2017 | Upgrade of PSB Cooling Station | (Minutes) |
31.05.2017 | Follow up on Building 245 | (Minutes) |
I | Attachment | History | Action | Size | Date | Who | Comment |
---|---|---|---|---|---|---|---|
![]() |
PSB_RFrenovation_01092011.pdf | r1 | manage | 239.3 K | 2011-09-05 - 11:56 | VivienRaginel |