RAC meeting

Minutes 17-06-2005

  • Contact Tim Whibley for cable correctly the arrays that were assigned to Castor.
  • Tests by DirkD will move from 8 node to 4 node RAC as for next week
  • Complete RAC set-up by mid-July (Marta and DirkG)

  • DirkD presented first tests on RAC with COOL SW [presentation]
    • Very good results showing scalability up to 8 nodes on lookups
    • Problems (known) on load balancing. Recalculates loads unfrequently.

  • Eva presented results of tests with ORacle IO Numbers [presentation]

  • DES/ADC got offers from DELL for RAC cluster. DES will get a 4 node RAC of 4CPU machines and ADC a 4 node RAC of 2CPU machines. Delivery time is very short (about 2/3 weeks). This HW is fully certified.
    • Try to contact referenced sites from DELL
    • DELL says very few people running biger than 4 node RAC
Topic attachments
I Attachment History Action Size Date Who Comment
PowerPointppt RACsetup_june2005.ppt r1 manage 48.5 K 2005-06-17 - 10:23 UnknownUser  
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2005-11-29 - unknown
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    PSSGroup All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback