LHCb Conditions (COOL) Replication

LHCb Planning and Schedule

Schedule (from above link)

  • 31 Jul 2006 - 04 Aug 2006 -
    • Setup streaming to one Tier-1 (RAL?) (two schemas to be replicated).
    • Data integrity tests.
    • Test privileges transmission through streams.
  • 07 Aug 2006 - 11 Aug 2006 -
    • Repeat the tests of the previous week with 2 Tier-1s (RAL nad CNAF?)
  • 14 Aug 2006 - 18 Aug 2006 -
    • Pause
  • 21 Aug 2006 - 25 Aug 2006 -
    • Add another Tier-1.
    • Recovery Tests.
  • 28 Aug 2006 - 01 Sep 2006 -
    • Test access to the DBs from the GRID (hopefully with the Persistency GRID enabled functionalities)
  • 04 Sep 2006 - 08 Sep 2006 -
    • Set up a LHCb managed RAC to simulate the PIT one.
    • Test cross replication PIT <-> CERN
    • Test the two step replication PIT -> CERN -> Tier-1.
  • 11 Sep 2006 - 15 Sep 2006 -
    • Pause (LHCb week in Heidelberg)
  • 18 Sep 2006 - 22 Sep 2006 -
    • Include the 3 missing Tier-1s and test from the GRID (with the Persistency GRID enabled functionalities).
  • Oct 2006 -
    • Conditions Database used by production jobs.

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2010-06-11 - PeterJones
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    PSSGroup All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback