@CERN: Luis, Dirk(3D), Eva(3D), Marco(LHCb), Saima, Sophie
General announcements:
Downstream capture configuration succesfully tested by Volker (from Oracle) and Eva
Plan for May: run up tests (using COOL condition data ) in order to measure the rate which can be achieved with Streams
Streams setup between 2 nodes 3D RAC and production configurations of the different sites
Upgrade OEM
Agents: how to connect to the OEM. Information will be available on the wiki page during the next weeks
Clients setup to populate the source database at CERN and test the stability and the throughput (Dirk + experiments)
The plan will be discussed again during the next meeting
Test plan status:
Stefan: no much progress
Saima: Some problems have been observed. A join meeting will be organized. Eva has remarked that MVs replication is not supported by Streams
Gancho: No further problems after the RAC reinstallation. Small tests running: 10 lxplus clients, 20h load, 1G per day, successfull results. He will go up with the next tests. Streams monitor tool sent by Eva is being used. Next week the destination will be changed to be a RAC destination (integration).