Expected phase 2 sites to report plans and concrete schedules. Dirk will send an email to contact them again.
Triumf (Denise by email): hw in place, power infrastructure ongoing. Setting up shared storage. Db nodes installed: RH4 64 bits. Wiki page is already updated.
NDGF: hw have been ordered. Dirk proposed a video conference to help on the database setup.
NIKHEF: hw have been ordered.
LHCb and ATLAS COOL tests:
LHCb(Marco): Streams setup from online to CERN and from CERN to Tier1 sites ready. First test was successfull: 1 condition per second during the whole night (this is what is expected for LHCb)
ATLAS(Gancho):
delete operations using rowid (Florbela code) non scalable using Streams, rowid cannot be translated easily on destination. Primary key used instead shows good results.
materialized views: used on the source database. They are not replicated, transactions must be filtered.
delete one error from the exception queue takes long time.
waiting for Taiwan to join: they have problems with OCFS. Dirk proposed Barbara to be in contact with them because at CERN it is not used.
BNL network problems to be analyzed by the network people.
CMS Frontier tests:
details on agenda
Luis:
queries from David Front for COOL compresion rate is too high - unrealistic
zip leves from 1 to 9: difference is not valuable. CPU consumption is similar (server)
test from FNAL: numbers are similar to Tier0 - dependant on the network
Squid + Gigabit at FNAL (prepared by Lee): available for tests