Welcome to the PS Upgrade Web Page

Mandate of the Study Group extracted from LIU mandate

The LHC Injectors Upgrade should plan for delivering reliably to the LHC the beams required for reaching the goals of the HL-LHC. This includes LINAC4, the PS booster, the PS, the SPS, as well as the heavy ion chain.

Project Break-down

The latest version of the Working Break-down Structure (WBS) is available at https://edms.cern.ch/document/1146814.

PSUpgrade Web Utilities

Edit | Attach | Watch | Print version | History: r15 < r14 < r13 < r12 < r11 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r15 - 2019-09-06 - HeikoDamerau
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    PSUpgrade All webs login

This site is powered by the TWiki collaboration platform Powered by PerlWeb page prepared by Simone Gilardoni