Interlock minutes held on 30th of September 2009

Present: B. Puccio, B. Todd, J. Wenninger, K. Hanke, J-L. Sanchez, J-C. Bau, E. Piselli, I. Kozsar, D. Nisbet, G. Metral, B. Mikulec.

Agenda:

  1. Overview of the Beam Interlock System (BIS) (B. Puccio)
  2. Software Interlock System (SIS) at the SPS and LHC (J. Wenninger)
  3. Upcoming issues to be solved (B. Mikulec)

1. Presentation of the Beam Interlock System (BIS)

-- BettinaMikulec - 2009-10-01

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf BIC-Overview_30Sept09.pdf r1 manage 3217.7 K 2009-10-01 - 15:26 BettinaMikulec BIC overview
PDFpdf Interlock_basics.pdf r1 manage 158.3 K 2009-10-01 - 15:28 BettinaMikulec Upcoming issues concerning the Linac4/PSB interlock system.
PDFpdf SIS.Sept09.pdf r1 manage 263.8 K 2009-10-01 - 15:27 BettinaMikulec SIS at the SPS and the LHC
Edit | Attach | Watch | Print version | History: r7 | r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2009-10-01 - BettinaMikulec
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright