Assigned to | Start date | Description | State | Result | |
---|---|---|---|---|---|
Main.BDgroup | 2008-11-13 | End-to-end simulation of TL with a bigger emittance beam from the source (50% higher?) | edit |
Assigned to | Start date | Description | State | Result | |
---|---|---|---|---|---|
Main.BDgroup | 2008-11-27 | Study tilt distribution of DTL gap errors | edit |
Assigned to | Start date | Description | State | Result | |
---|---|---|---|---|---|
Main.BDgroup | 2008-11-27 | repeat CCDTL gap errors after tilt correction (without levelling field peaks) | edit |
Assigned to | Start date | Description | State | Result | |
---|---|---|---|---|---|
Main.BDgroup | 2008-11-27 | Repeat error studies for the whole linac in one go | edit |
Assigned to | Start date | Description | State | Result | |
---|---|---|---|---|---|
Main.BDgroup | 2009-01-22 | Study possibility of beam intensity modulation in ppm by changing quadrupoles strength in the chopper line | edit |