Beam dynamics followups

Assigned to Start date Description State Result
Main.BDgroup 2008-11-13 End-to-end simulation of TL with a bigger emittance beam from the source (50% higher?)   edit

Assigned to Start date Description State Result
Main.BDgroup 2008-11-27 Study tilt distribution of DTL gap errors   edit

Assigned to Start date Description State Result
Main.BDgroup 2008-11-27 repeat CCDTL gap errors after tilt correction (without levelling field peaks)   edit

Assigned to Start date Description State Result
Main.BDgroup 2008-11-27 Repeat error studies for the whole linac in one go   edit

Assigned to Start date Description State Result
Main.BDgroup 2009-01-22 Study possibility of beam intensity modulation in ppm by changing quadrupoles strength in the chopper line   edit
Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2009-01-22 - GiuliaBellodi
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright