Beam dynamics followups

Assigned to Start date Description State Result
Main.BDgroup 2008-11-13 End-to-end simulation of TL with a bigger emittance beam from the source (50% higher?)   edit

Assigned to Start date Description State Result
Main.BDgroup 2008-11-27 Study tilt distribution of DTL gap errors   edit

Assigned to Start date Description State Result
Main.BDgroup 2008-11-27 repeat CCDTL gap errors after tilt correction (without levelling field peaks)   edit

Assigned to Start date Description State Result
Main.BDgroup 2008-11-27 Repeat error studies for the whole linac in one go   edit

Assigned to Start date Description State Result
Main.BDgroup 2009-01-22 Study possibility of beam intensity modulation in ppm by changing quadrupoles strength in the chopper line   edit


This topic: SPL > BeamDynamics > BeamDynamicsFollowups
Topic revision: r1 - 2009-01-22 - unknown
 