Beam dynamics followups
Assigned to | Start date | Description | State | Result | |
---|
Main.BDgroup |
2008-11-13 |
End-to-end simulation of TL with a bigger emittance beam from the source (50% higher?) |
|
|
edit |
Assigned to | Start date | Description | State | Result | |
---|
Main.BDgroup |
2008-11-27 |
Study tilt distribution of DTL gap errors |
|
|
edit |
Assigned to | Start date | Description | State | Result | |
---|
Main.BDgroup |
2008-11-27 |
repeat CCDTL gap errors after tilt correction (without levelling field peaks) |
|
|
edit |
Assigned to | Start date | Description | State | Result | |
---|
Main.BDgroup |
2008-11-27 |
Repeat error studies for the whole linac in one go |
|
|
edit |
Assigned to | Start date | Description | State | Result | |
---|
Main.BDgroup |
2009-01-22 |
Study possibility of beam intensity modulation in ppm by changing quadrupoles strength in the chopper line |
|
|
edit |
This topic: SPL
> BeamDynamics > BeamDynamicsFollowups
Topic revision: r1 - 2009-01-22 - GiuliaBellodi