Minutes of the Booster Commissioning Working Group Meetings


2010 Minutes 2011 Minutes
04 February Integration Dump/LBE/LBS Lines 14 March PSB Fluka simulations, LBS Update
25 February Integration Dump/LBE/LBS Lines, LBS Simulations Update
11 March LBS line dump + Integration LBE/LBS
19 April Discussion Screens for Dump Line/LBE Line
25 June BLMs in the PSB injection region
18 November Alternative for Linac4 Beam Energy Measurement

2007 Minutes 2008 Minutes 2009 Minutes
22 November 07 February 08 January status of dump designs and intercepting devices
20 December 20 March 19 March LBS line upgrade studies
  10 April 12 June interlocks
  22 May 30 July transv. emittance measurement after Linac4; LBS line
  03 July 17 September Brainstorming Commissioning; Joint meeting with PSB Beam Dynamics with Linac4 WG
  06 November 01 October Brainstorming Commissioning; Joint meeting with PSB Beam Dynamics with Linac4 WG

Link to Meeting minutes 'PS Booster head and tail dumps with Linac4' (19/03/2009):
http://carli.web.cern.ch/carli/PSBwithLinac4/Meeting09_03_19/Minutes09_03_19.html

Interlocks

2009 Minutes 2010 Minutes 2011 Minutes
12 June Introduction I 30 September 2010 Linac4/PSB interlock design proposal I 22 July 2011 Chopper and BIS
29 September PSB injection
30 September BIS, SIS
07 December Timings to kill beam

ActionListBCWG

-- BettinaMikulec - 23 Nov 2007

Edit | Attach | Watch | Print version | History: r36 < r35 < r34 < r33 < r32 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r36 - 2011-07-25 - BettinaMikulec
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright