meeting 89 (19 Nov 08) | LLRF, HOMs, collaborations |
---|---|
meeting 88 (15 Oct 08) | Linac'08 review, chopper driver, SC cavity R&D at CERN |
meeting 87 (09 Sep 08) | LHeC, energy recovery from SC cavities, HB'08 review, klystron modulators for LP/HP-SPL |
meeting 86 (04 Jul 08) | funding, summary of SPL review, H- source program within SLHC-PP, chopper |
meeting 85 (14 Nov 07) | FP7, SC RF test stand at CERN, frequencies for the SPL |
---|---|
meeting 84 (20 Sep 07) | status of LPSPL and SPL, collaborations, RCS vs LPSPL, siting, tunnel integration, civil engineering |
meeting 83 (11 Apr 07) | modulators for Linac4 and SPL, cryogenics and cryostats for the LPSPL, low power SPL |
meeting 82 (13 Dec 06) | Orbit simulations for the PSB, comparison of normal conducting pi/2 mode structures, pi/2 or pi-mode structures for Linac4? |
---|---|
meeting 81 (16 Aug 06) | future of the SPL study, "slim" SPL, 3D layout of Linac4 in the South Hall |
meeting 80 (14 Jun 06) | H0 dump for PSB injection, flexible SPL operation for neutrino and other applications |
meeting 79 (10 May 06) | diagnostics in Linac4, SC triple-spoke cavities from 90 to 180 MeV |
meeting 78 (08 Mar 06)![]() |
CDR2 status, cryogenics, H- stripping in transfer lines, PSB H- injection for Linac4, SC triple-spoke cavities from 90 to 180 MeV |
meeting 77 (08 Feb 06)![]() |
CDR2 status, layout and surface buildings, H- stripping in transfer lines, cooling and ventilation |
meeting 76 (07 Dec 05)![]() |
EURISOL target energies, FDI Technology: fast high voltage pulser, beam shape and halo monitor, Linac4 under 'Mont Citron' |
---|---|
meeting 75 (19 Oct 05)![]() |
radiation shielding, 5 MW operation for EURISOL, CDR2 progress, cryogenic infrastructure, H- source |
meeting 74 (07 Sep 05)![]() |
beam chopper, CDR2 progress, RFQ status |
meeting 73 (20 Jul 05)![]() |
prospects for Linac4; SPL cryostats; ion sources; CDR2: draft chapters, deadlines, new lattice; Linac4 layout |
meeting 72 (01 Jun 05)![]() |
SPL Reorganization, RFQ Status, HPSL05 workshop, ISTC and China collaborations, Bunchers |
meeting 71 (06 Apr 05)![]() |
SPL CDR2 |
meeting 70 (16 Feb 05)![]() |
DTL Task Force |
meeting 69 (05 Jan 05)![]() |
Preliminary results of CCDTL re-optimisation, Report on the Indian Symposium on Nuclear Physics and BARC |
meeting 68 (17 Nov 04)![]() |
Status of the 3 MeV Front-end Project |
---|---|
meeting 67 (15 Sep 04)![]() |
Status of the 3 MeV Front-end Project, End-to-end simulations of Linac4 |
meeting 66 (11 Aug 04)![]() |
Survey of H- sources for Linac4 |
meeting 65 (02 Jun 04)![]() |
Summary and outcome of workshop "Physics with a multi-MW proton source", Progress with HIPPI |
meeting 64 (21 Apr 04)![]() |
Future plans on H- source development, Progress on the definition of the 3 MeV test stand |
meeting 63 (23 Mar 04)![]() |
Normal Conducting Structures for Linac4 and the ISTC Collaborations |
meeting 62 (04 Feb 04)![]() |
Progress on the Bunch Shape and Halo Monitor, Shielding calculations for the 3 MeV test stand, EDMS for the SPL |
meeting 61 (17 Dec 03)![]() |
Test of High-Power Phase Shifter, Progress on the chopper amplifier |
---|---|
meeting 60 (29 Oct 03)![]() |
Summary of the IPHI-SPL coordination meeting, LEBT for a future H- source at CERN, ITEP contribution to Linac4 design |
meeting 59 (01 Oct 03)![]() |
Technical layout of the chopper, The 3 MeV test line, Design of the 90-160 MeV linac section |
meeting 58 (27 Aug 03)![]() |
HIPPI, High-power target material, SCL from 92.2 to 160 MeV, determine the cavity-waveguide coupling coefficient beta |
meeting 57 (11 Jun 03)![]() |
Summary Halo Workshop, Diagnostics, 3 MeV H- chopper beam dump, Gated time-resolved spatial profile monitor, Prototype basse energie pour accelerateurs forte puissance, H- generation |
meeting 56 (16 Apr 03)![]() |
Source developments at CERN - preliminary results, HIPPI proposal |
meeting 55 (05 Mar 03)![]() |
Progress on the chopper line design, Progress on the Beam Shape and Halo Monitor, News from the HIPPI proposal to Europe |
meeting 54 (15 Jan 03)![]() |
Progress on the amplitude and phase modulator, Status of the CCDTL prototype, Consideration of the target for the SPL |
meeting 53 (04 Dec 02)![]() |
Induced radioactivity in the target station and decay tunnel, Summary of the SAFERIB workshop, The "High Intensity Proton" program and the SPL study |
---|---|
meeting 52 (06 Nov 02)![]() |
PSB H- charge exchange injection - preliminary simulations for the CNGS case, More simulations of PSB injection |
meeting 51 (18 Sep 02)![]() |
Summary of the study on PSB performance with Linac 4, Preliminary analysis of the consequences on the linac design of a change in linac energy, Progress and schedule of the design of the 3 MeV chopper line, Guidelines for the preparation of the collaboration meeting with CEA & IN2P3 in October |