Minutes of the SPL study group

shortcuts to 2002, 2003, 2004, 2005, 2006, 2007

search minutes (from #51 onwards)

2008 meetings

meeting 89 (19 Nov 08) LLRF, HOMs, collaborations
meeting 88 (15 Oct 08) Linac'08 review, chopper driver, SC cavity R&D at CERN
meeting 87 (09 Sep 08) LHeC, energy recovery from SC cavities, HB'08 review, klystron modulators for LP/HP-SPL
meeting 86 (04 Jul 08) funding, summary of SPL review, H- source program within SLHC-PP, chopper

2007 meetings

meeting 85 (14 Nov 07) FP7, SC RF test stand at CERN, frequencies for the SPL
meeting 84 (20 Sep 07) status of LPSPL and SPL, collaborations, RCS vs LPSPL, siting, tunnel integration, civil engineering
meeting 83 (11 Apr 07) modulators for Linac4 and SPL, cryogenics and cryostats for the LPSPL, low power SPL

2006 meetings

meeting 82 (13 Dec 06) Orbit simulations for the PSB, comparison of normal conducting pi/2 mode structures, pi/2 or pi-mode structures for Linac4?
meeting 81 (16 Aug 06) future of the SPL study, "slim" SPL, 3D layout of Linac4 in the South Hall
meeting 80 (14 Jun 06) H0 dump for PSB injection, flexible SPL operation for neutrino and other applications
meeting 79 (10 May 06) diagnostics in Linac4, SC triple-spoke cavities from 90 to 180 MeV
meeting 78 (08 Mar 06) CDR2 status, cryogenics, H- stripping in transfer lines, PSB H- injection for Linac4, SC triple-spoke cavities from 90 to 180 MeV
meeting 77 (08 Feb 06) CDR2 status, layout and surface buildings, H- stripping in transfer lines, cooling and ventilation

2005 meetings

meeting 76 (07 Dec 05) EURISOL target energies, FDI Technology: fast high voltage pulser, beam shape and halo monitor, Linac4 under 'Mont Citron'
meeting 75 (19 Oct 05) radiation shielding, 5 MW operation for EURISOL, CDR2 progress, cryogenic infrastructure, H- source
meeting 74 (07 Sep 05) beam chopper, CDR2 progress, RFQ status
meeting 73 (20 Jul 05) prospects for Linac4; SPL cryostats; ion sources; CDR2: draft chapters, deadlines, new lattice; Linac4 layout
meeting 72 (01 Jun 05) SPL Reorganization, RFQ Status, HPSL05 workshop, ISTC and China collaborations, Bunchers
meeting 71 (06 Apr 05) SPL CDR2
meeting 70 (16 Feb 05) DTL Task Force
meeting 69 (05 Jan 05) Preliminary results of CCDTL re-optimisation, Report on the Indian Symposium on Nuclear Physics and BARC

2004 meetings

meeting 68 (17 Nov 04) Status of the 3 MeV Front-end Project
meeting 67 (15 Sep 04) Status of the 3 MeV Front-end Project, End-to-end simulations of Linac4
meeting 66 (11 Aug 04) Survey of H- sources for Linac4
meeting 65 (02 Jun 04) Summary and outcome of workshop "Physics with a multi-MW proton source", Progress with HIPPI
meeting 64 (21 Apr 04) Future plans on H- source development, Progress on the definition of the 3 MeV test stand
meeting 63 (23 Mar 04) Normal Conducting Structures for Linac4 and the ISTC Collaborations
meeting 62 (04 Feb 04) Progress on the Bunch Shape and Halo Monitor, Shielding calculations for the 3 MeV test stand, EDMS for the SPL

2003 meetings

meeting 61 (17 Dec 03) Test of High-Power Phase Shifter, Progress on the chopper amplifier
meeting 60 (29 Oct 03) Summary of the IPHI-SPL coordination meeting, LEBT for a future H- source at CERN, ITEP contribution to Linac4 design
meeting 59 (01 Oct 03) Technical layout of the chopper, The 3 MeV test line, Design of the 90-160 MeV linac section
meeting 58 (27 Aug 03) HIPPI, High-power target material, SCL from 92.2 to 160 MeV, determine the cavity-waveguide coupling coefficient beta
meeting 57 (11 Jun 03) Summary Halo Workshop, Diagnostics, 3 MeV H- chopper beam dump, Gated time-resolved spatial profile monitor, Prototype basse energie pour accelerateurs forte puissance, H- generation
meeting 56 (16 Apr 03) Source developments at CERN - preliminary results, HIPPI proposal
meeting 55 (05 Mar 03) Progress on the chopper line design, Progress on the Beam Shape and Halo Monitor, News from the HIPPI proposal to Europe
meeting 54 (15 Jan 03) Progress on the amplitude and phase modulator, Status of the CCDTL prototype, Consideration of the target for the SPL

2002 meetings

meeting 53 (04 Dec 02) Induced radioactivity in the target station and decay tunnel, Summary of the SAFERIB workshop, The "High Intensity Proton" program and the SPL study
meeting 52 (06 Nov 02) PSB H- charge exchange injection - preliminary simulations for the CNGS case, More simulations of PSB injection
meeting 51 (18 Sep 02) Summary of the study on PSB performance with Linac 4, Preliminary analysis of the consequences on the linac design of a change in linac energy, Progress and schedule of the design of the 3 MeV chopper line, Guidelines for the preparation of the collaboration meeting with CEA & IN2P3 in October

SPLminutesTemplate

-- FrankGerigk - 06 Aug 2007

Edit | Attach | Watch | Print version | History: r16 < r15 < r14 < r13 < r12 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r16 - 2008-11-19 - FrankGerigk
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright