Minutes RF structure meeting 04.04.2009

S. Ramberger, M. Schuh, G. DeMichele, F. Grespan

DTL

  • Prototype still not leak tight after check with PVC plugs (SuitbertRamberger)
  • Buncher cavity: Open issues to be discussed with Frank (GiovanniDeMichele)
  • Power coupler: simulation with reduced iris length due to better fit with DTL mechanic (GiovanniDeMichele)
  • Circuit Model: circuit simulation of the PC stabilization has to be checked with bead pull on DTL cold model; waiting for cell realignment (FrancescoGrespan)

HOM (MarcelSchuh)

  • Emittance growth simulation results for different HOM setups presented

-- MarcelSchuh - 03 Apr 2009

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2009-04-07 - SuitbertRamberger
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright