F. Gerigk, S. Ramberger, G. DeMichele , and P. Tirado
DTL
- The new drift tube with the magnet will be mounted on the prototype at the end of Janaury.
- The new geometry of the DT will increase the frequency of the prototype and maybe will induce a tilt in the field to be checked with measurements.
CCDTL
- J.Mointeiro and J.M.Giguet in contact with companies to deliver the material to the Russian Institutes: delivery foreseen at the end of January 2010.
- Measurements on the CCDTL Russian prototype to determine the frequency of the coupling cell started using the perturbation approach from Vaccaro.
PIMS
SPL
- Preparation for Chamonix workshop: a new study group was created to assess the performance gain for LHC with the new injectors.
--
GiovanniDeMichele - 04-Dec-2009