F. Gerigk, R. Wegner , G. DeMichele
DTL
- Prototype high power test
- Prototype with magnets in the first DT and in the LE end-cone conditioned at 3% d.c. (width=1.5msec; repetition rate=20Hz)
- Removed magnet in the LE end-cone for the installation of the anodizing matrix: at the moment the prototype is under vacuum
CCDTL
- the designed support, integrated in KATIA files, shows interferences of the structure in the survey area: modifications to be applied
- visit to Russia planned on 15-17th June
PIMS
- Welding on the prototype finished
- Prototype high power test
- the test will be done in the 3MeV test stand area: concrete wall for x-rays shielding (discussion with RP group: T. Otto, M. Widorski)
- alignment and shrinking measurements after welding ongoing
Debuncher cavity
- +/- 80 degrees phase shift in 40usec period is possible by changing the loaded Q (QL=6000, Pcav=25kW)
--
GiovanniDeMichele - 07-Jun-2010