F. Gerigk, S. Ramberger, G. DeMichele , M. Schuh, and P. Tirado

New Member introduced:

Charmonix

  • Consolidation work on existing injector chain
  • SPL will continue as R&D project
  • see also: Summary session

DTL

  • optimisation studies
    • move one cell from tank 2 to 3
    • effect of odd number of cells in tank is under discussion
  • LLRF
    • existing hardware can be used with minor modifications
    • software has to be adapted - at least 3 month work with close colabroation of LLRF group
    • own software solution for test stand

PIMS

  • Schedule for welding relaxed about 6 month
  • Decision has to be taken if structures will be welded or brazed.
    • Not jet clear if the reduced rigidity introduced by brazing is tolerable.
    • For the welding option still not clear where to do it (CERN or Juelich)
  • Matlab fitting program ready
  • Test box at test stand broken. Request for repair and other test box for the meantime (action G. DeMichele)

SPL

  • Close collabroation with ESS, e.g.trainging of ESS staff at CERN facilties.

HOM

  • Calulation of Qex for fundamental bandpass modes using HFSS and MWS (slighty different models). The calulated values differ about 10%.

-- MarcelSchuh - 05-Feb-2010

Edit | Attach | Watch | Print version | History: r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2010-02-05 - MarcelSchuh
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    SPL All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright